REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please see red markups on plans. Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments.Provide legible plans that are to scale for archiving.Clearly indicate the scope of work under this building permit application:
- Revise project job description on the building permit application worksheet to reflect the work to be done
under the subject building permit application.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application. This includes mechanical, plumbing and electrical work that is not specifically required by
the Building Code.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by
the Public Works Agency (647-5039) (IF APPLICABLE)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceA separate Building Permit Application is required for:
- Each sign
- Trash enclosure(s)
- Site improvementsDrawings must be to scale.
- Show North Arrow on Plan Views
- Provide an Index of Drawings on cover sheet
- Provide a fully dimensioned Floor Plan (see markups)Show on the plans:
- Complete legal description
- Assessor’s Parcel NumberAdd note on cover sheet indicating that the newly created suite is not a part of this permit. A separate tenant improvement permit shall be required prior to occupancy. Restrooms may be required.Provide exiting and disabled access compliant exit door for new suite with path of travel. The current door opens to unloading area for autos.Provide a wall legend indicating whether the wall is:
- Existing, new, or to be removed
- A fire-resistive assembly
- Bearing walls versus non-bearing partitionsProvide typical section view detail of all new partitions and ceilings showing:
- Size, spacing, and material of framing members
- Note gauge and ICC Research Report number and installation/construction requirements for metal framing
members.
- It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of
the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing
field problem of 2½” wide metal studs not being able to accommodate plumbing pipes.
- Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13
for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations
and drawing prepared by a registered engineer are submitted for review. Submit structural engineering
calculations for walls in rooms with a floor to building structure above height greater than 14’.
- Provide on the drawings details for the lateral support of partitions, rails and similar space dividers less than
5’ 9” in height.
- Sheathing material and details of attachment. Note type, size, and spacing of fasteners.
- Heights of partition, suspended ceiling, structure above.
- Fire-blocks and draft-stops in combustible construction in accordance with CBC Section 717. Show
location(s) and provide typical construction details.Provide on the drawings a complete door schedule, showing:
- Door sizes (CBC Sections 1008.1.1 and 1133B.2)
- Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and
1133B.2.5)
- Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department
Crime Prevention Section by telephoning 714-647-5840)CBC Section 1008.1.8, Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”All entrances and exterior ground-floor exit doors to buildings and facilities shall be made accessible to persons with disabilities. Doorways shall have a minimum clear opening of 32” with the door open 90 degrees, measure between the face of the door and the opposite stop. Doorways require dimensioning on the plans to insure compliance with the required landing area/maneuvering clearances at doors in accordance with CBC Section 1133B.2.4.2 and CBC Figures 11B-26A and 11B-26B.CBC Section 1133B.2.5.1, Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.CBC Section 1133B.2.5, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Stairways shall show compliance with CBC Sections 1009 and 1133B.4 including applicable disabled accessibility requirements.
- Provide complete architectural plan view, sections, details, and notes for stairway(s).
- Dimension stairway width showing compliance with CBC Sections 1009.1, 1005, and 1007.3.
- Dimension rise of steps shall be not less than 4” or greater than 7”. The run shall not be less than 11”.
- Treads, nosing, and risers require compliance with CBC Section 1133B.4.5, including no open risers and slip
resistant treads.
- CBC Section 1009.2, Dimension stairway headroom clearance. 6’ 8” minimum clearance.There shall be no enclosed usable space under exterior exit stairways unless the space is completely enclosed in 1-hour fire-resistance-rated construction. The open space under exterior stairways shall not be used for any purpose.CBC Section 1133B.4.4, The upper approach and the lower tread of each interior stair shall be marked by a strip of clearly contrasting color at least 2” wide placed parallel to and close to (not more than 1” from) the nose of the step or landing to alert the visually impaired. The strip shall be of material that is at least as slip-resistant as the other treads of the stairs.CBC Section 1133B.4.3, Tactile floor designation signs that comply with Section 1117B.5, Item 1, shall be located at each floor level landing in all enclosed stairways in buildings two or more stories in height to identify the floor level. At exit discharge level, the sign shall include a raised five-pointed star located to the left of the identifying floor level. The outside diameter of the star shall be the same as the height of the raised characters.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”
- Each exit door that leads directly to a grade-level exterior exit by means of a stairway or ramp shall be
identified by a tactile exit sign with the following words as appropriate:“EXIT STAIR DOWN”
- Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual
exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsCBC Sections 1102B, 1124B.1 and 1127B.1. Provide a continuous walking surface from each exit door to public way.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5.
Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Professional medical and dental offices shall be made accessible and shall also comply with Section 1109B.2. (CBC Section 1105B.3.2). This requirement includes providing at least one accessible entrance protected from the weather by canopy or roof overhead. Such entrances shall incorporate a passenger loading zone. Passenger loading zones shall provide an access aisle at least 60” wide and 20’ long adjacent and parallel to the vehicle pull-up space. Vehicle standing spaces and access aisles shall be level with surface slopes not exceeding 1 unit vertical in 50 units horizontal (2% slope) in all directions.Disabled accessible parking spaces should be sized per CBC:
- Callout all dimensions on siteplan or enlarged plan.Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section1115B.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 1115B and the California Plumbing Code.CBC Section 1122B.1. Provide a counter that is at least 36” long and no more than 28 to 34” high.This building is subject to the State of California Energy Conservation Regulations:
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is
qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations
(CCR,) Title 24, Par 6, 2008 California Energy Code. The plan check consultant must sign documentation
certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency.
- The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance
documentation with completed signature blocks filed on the plans. The same information may be copied on
the Electrical Plans for the Electrical Plan Checker.
- Provide cool roofing as required by 2008 Energy Standards.
- The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant
Qualification Statement.”Note ICC Research Report Number on the drawings for the suspended ceiling system or callout minimum “heavy-duty” rated system.See structural markups on plans for minor corrections.