Loading...
HomeMy WebLinkAbout169187_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER: George MoranTEL:714 667-2771FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. Show the complete legal description and assessor's parcel number on the plans. Provide an Index of drawings on cover sheet. Show the North arrow on the plans and centerline of labeled street(s) and alley. Provide eave / overhang / projection setback to all property lines.Show 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. For each enclosed attic space with a maximum vertical height greater than 30 inches, provide a minimum of 22 x 30 inches attic access. (CRC R807.1) Glazing in door and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathrooms, showers less than 5’ above the standing surface shall have a minimum category classification of II (CPSC 16 CFR 1201). (CRC TR308.3.1 (1) & 308.4(5)) Show exterior wall construction assembly. A minimum of one layer of No. 15 asphalt felt, free from holes and breaks, complying with ASTM D 226 for Type 1 felt shall be applied over studs of all exterior walls. Specify that two layers of Grade D or 60 minute Grade D paper shall be applied over all wood base sheathing. (CRC R703.2) Specify a minimum 0.019” (No. 26 galvanized sheet gage) corrosion-resistant or plastic weep screed located below foundation plate line and 4 inches above grade on all exterior stud walls or 2-inches above paved areas. (CRC R703.6.2.1) Provide a weep screed for stucco at the foundation plate line a minimum of 4 inches above the earth or 2 inches above paved areas. (2512.1.2) Show location of underfloor access crawl hole (18 x 24 inches). (CRC R408.4) Note on the plans that foundation anchor bolts in walls shall have an approved plate washer under each nut; and the nuts shall be tightened just prior to covering the wall framing. Plate washers a minimum of 3 inch by 3 inch by 0.229 inch thick shall be used on each bolt. (AF&PA SDPWS 4.3.6.4.3) Detail how the interior shear walls are connected to the roof/floor diaphragm(s). (1603)The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1): - All plumbing walls are to be framed with a minimum of 6" studs. - Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC Section 2308.10.4.2 allowances. - Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11)Note on plans that “Field-cutting ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4”. (CRC R317-1.1) For plywood roof and floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and required blocking and panel layout pattern. Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6 If required by structural calculations, show size, location and embedment length of hold down anchors on foundation plan. Note on plan that holdown hardware must be secured in place prior to foundation inspection. The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans. - Signed Energy Efficiency Documents must be printed on the plans. - Also, submit 2 copies of signed Energy Efficiency calculations. - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2008 California Energy Code). The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. -The energy plan check consultant must sign documentation forms on behalf of the Building Safety Division. - The energy plan check consultant must also complete the attached “Energy Conservation Plan Check Consultant Qualification Statement”. - Refer to the attached public handouts titled “Energy Efficiency Compliance” and “Energy Efficiency Compliance Documentation”. - Clarify location and size of all existing and new windows on the drawings. Revise T-24 energy calculations to show compliance. - Please refer to attached Residential Lighting Design Guide and revise drawings to show compliance. Provide continuous operating exhaust fan in the bathroom with required ventilation rate per Section 150-o, Table 4-7 of 2008 Residential Compliance Manual. Ventilation air must come directly from the outdoors and not from attic or crawl spaces. Specify that Ground Circuit Interrupter (GFI) outlets shall be provided in bathrooms, garages, basements, crawl spaces, outside, and at all kitchen counters and islands. (CEC 210.8(A)) Provide an electrical floor plan showing location of receptacle and lighting outlets. (CEC 210.52(A-H) & 210.70) All power and lighting outlets in family rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, hallways and similar areas are to be protected by a “combination AFCI breaker”. Kitchens, bathrooms, and basements are exempt from this requirement. (CEC 210.12(B)) Bathrooms and powder rooms are required to have at least one GFI receptacle outlet within 36 inches of each lavatory. (CEC 210.52(D)) Lighting outlets are required in habitable rooms, bathroom, hallways, garages, and at exterior doors. Revise plans to show compliance. (CEC 210.70(A))