HomeMy WebLinkAbout168905_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:
George MoranTEL:714
667-2771FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper.
Provide an Index of drawings on cover sheet.
Provide building information on plans:
- Occupancy type: R3 / U
- Construction type: Type V – B
Provide a statement on the title sheet of the plans that this project shall comply with following codes:
- 2010 California Residential Code (CRC)
- 2010 California Building Code (CBC)
- 2010 California Electrical Code (CEC)
- 2010 California Mechanical Code (CMC)
- 2010 California Plumbing Code (CPC)
- 2010 California Green Building Standards Code (CGBS) or CALGreen
- 2010 California Energy Code (CEnC)
- City of Santa Ana Municipal CodeShow location of heating equipment on the plans. (CRC R303.8)Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.Bathroom or service room minimum window areas shall not be less than 3 square feet and 50% openable or, provide a mechanical ventilation system exhausted to the outside capable of providing 50 cubic feet per minute for intermittent ventilation 25 cubic feet per minute for continuous ventilation. (CRC R303.3) Bathrooms, laundry rooms, water closet compartments and similar rooms shall be mechanically ventilated in accordance with the CMC.Specify that the maximum slope of any landing shall not exceed ¼ inch per foot. (CRC R311.3) Call out minimum thickness of 3½ inch concrete slab on grade, reinforcement, and moisture barrier on foundation plan. (1910.1)
Add note on foundation plan: All hold downs must be tied in place prior to foundation inspection.
3”x3”x.229” steel plate washers are required on all anchor bolts in a braced wall line. (CRC R403.1.6.1)
Revise footing detail ___________ to show bottom rebar at least 3” CLEAR from ground below. (1907.5)
Show minimum 18-inch underfloor clearance from grade to bottom of floor joists and minimum 12-inch clearance to bottom of girders. (2304.11.2.1)
Specify that foundation sills shall be pressure-treated or foundation grade Redwood. (2304.11.2.2)
Note on the plans that foundation anchor bolts in walls shall have an approved plate washer under each nut; and the nuts shall be tightened just prior to covering the wall framing. Plate washers a minimum of 3 inch by 3 inch by 0.229 inch thick shall be used on each bolt. (AF&PA SDPWS 4.3.6.4.3)The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1):
- Permissible notching and boring of joists are to be shown on the plans and shall not exceed CBC
Section 2308.10.4.2 allowances.
- Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored
holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the
edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11)Sills and sleepers in direct contact with concrete or masonry that is in direct contact with the ground and girders with less than ½” clearance to masonry and concrete shall be pressure treated or naturally durable to decay. (CRC R317.1 (3&4)) Note on plans that “Field-cutting ends, notches and drilled holes of preservative-treated wood shall be treated in the field in accordance with AWPA M4”. (CRC R317-1.1)
Doubled joists are required under parallel bearing partitions. CRC R502.4
For plywood roof and floor diaphragm specify thickness, grade, T&G edges, panel span rating, nailing schedule and required blocking and panel layout pattern.
Provide details for retrofit shear and tension anchor bolts on plans. Provide calculations as needed
Call out anchor bolt size and spacing on foundation plan. Provide 1/2" diameter embedded 7" minimum at 6' o.c. maximum spacing (4' o.c. for 2 stories). CRC R403.1.6
The end of wood girders entering exterior masonry or concrete walls shall be protected with a 1/2" air space or provide pressure treated lumber. CBC 2304.11.2.5.
Specify on the framing plans the shear wall material, thickness, size and spacing of fasteners and sole plate nailing. Call out anchor bolt spacing and hold down hardware on foundation plan.Revise plans to indicate how separate combustion air is provided for FAU located in attic. (CMC 701.3)