REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.Change type of the construction to reflect VB-SPK.Change type Occupancy to reflect S1 and MThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Public Works Agency approval (647-5039)- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance13. Submit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.The length of a common path of egress travel in Group B, F and S occupancies shall not be more than 100’, provided that the building is equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1. CBC Section 1014.3.Provide exit door from the ware house since roll up door is not acceptable as an exit door.Table 1019.2 For Buildings With One Exit:Maximum HeightMaximum OccupantsOf Building(Or Dwelling Units)
Occupancy Above Grade PlanePer Floor And Travel Distance
A, B, E, F, M, U1 Story49 occupants and 75’ travel distance
S1 Story29 occupants and 100’ travel distance
B, F, M, S2 Stories30 occupants and 75’ travel distanceCBC Section 1133B.2.5, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”On the site plan show, if there is any side walk .If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5.
Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.CBC Table 11B-6 establishes the number of accessible parking spaces required. Revise the drawings to show at least___disabled accessible parking spaces including___van accessible spaces.Provide parking data on the site plan showing the total number of parking spaces provided, the number of disabled accessible spaces and the number of van accessible spaces, showing compliance with CBC Section 1129B and CBC Table 11B-6.CBC Section 1129B.3, Item 4. Surface slopes of accessible parking spaces shall be the minimum possible and shall not exceed 1 unit vertical to 50 units horizontal (2% slope) in any direction.Loading and unloading aisle shall be on the passenger side of the vehicle.CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.If the length of the partition between sink and urinal is greater than 24” , additional 6” space shall be provided maneuvering space on both sides (sink and urinal).Provide 30” x 48” clearance at the urinal .Show all the mezzanine area on the demo plan.Make a note “ No structural member will be altered due to mezzanine removal.”Show ceiling joist direction and the span. Detail 4/ A10.1 doesn’t match the location.The reflected ceiling and details must show compliance with CBC section 711.3.1 and 1705 (Special inspection) for suspended ceiling system.