PLAN CHECK NO:
2~58, 10174163~68
PROJECT ADDRESS:
LOTS A & C STRUCTURAL PLANS ONLY
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION: Varies per building
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.
All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1).
This review and comments are for the structural plans only. Architectural plans shall be submitted separately and will be reviewed separately.
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
-Grading Permit. Application is made through the Building Safety Division (647-5800) and the
plan review is by the Public Works Agency (647-5039).
Provide the two copies of soil reports that are referenced on the structural plans.
Building 13 (Lot A):
Clarify location of new floor beam in calculations (page 3). 4x10 floor beam is not shown on plans.
Clarify if the foundation is a CMU or concrete foundation. The foundation plan legend calls out (E) CMU whereas the details show (E) concrete foundation, including holdown retrofit epoxy details.
The new shearwalls at lateral design Line 4 terminate at the floor diaphragm with no foundation below. Provide drags at the floor diaphragm to the foundation at the same line with additional shear anchor bolts to transfer the lateral loads to the foundation.
Building 1A (Lot A):
A enlarge footing below one of the Simpson Strong-walls is missing on the foundation plan.
Provide double floor joists below (E) headers at the interior of the building, in the transverse direction at south portion of building.
Building 4 (Lot C):
Clarify if the foundation is a CMU or concrete foundation. The foundation plan legend calls out (E) CMU whereas the details show (E) concrete foundation, including holdown retrofit epoxy details.
The new shearwalls at lateral design Line 4 terminate at the floor diaphragm with no foundation below. Provide drags at the floor diaphragm to the foundation at the same line with additional shear anchor bolts to transfer the lateral loads to the foundation.
Laundry room plans (Lots A & C):
Provide lateral design for shear line adjacent to trellis or provide justification for no shearwalls at this line.
Clarify if the trellis is attached to the laundry room.
Provide lateral design for the trellis structure.