Loading...
HomeMy WebLinkAbout169876_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceCBC Section 708.4, Fire partitions shall extend from the top of the foundation or floor/ceiling assembly below to the underside of the floor or roof sheathing, slab or deck above or to the fire-resistance-rated floor/ceiling or roof/ceiling assembly above, and shall be securely attached thereto. If the partitions are not continuous to the sheathing, deck or slab, and where constructed of combustible construction, the space between the ceiling and the sheathing, deck or slab above shall be fire-blocked or draft-stopped in accordance with Sections 717.2 and 717.3 at the partition line. The supporting construction shall be protected to afford the required fire-resistance rating of the wall supported, except for tenant and sleeping unit separation walls and corridor walls in buildings of Types IIB, IIIB, and VB construction.Provide complying exiting plan for the “reminder” area. Note the use of adjacent units.Provide sf of the adjacent suite.Provide number of exits required by CBC Sections 1015 and 1016. (For adjacent suite)Provide typical complete section view through one-hour corridor(s) showing compliance with CBC Sections 1017 and 708: - Size, spacing, and material of framing members. Note gauge and ICC number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawings prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Sheathing material and details of attachment. Note type, size, and spacing of fasteners. - Height of partition, suspended ceiling, structure above. - Reference each wall and ceiling fire-resistive assembly to a CBC Chapter 7 Table and item number. - Fire blocks and draft stops in combustible construction in accordance with CBC Section 717. Show location(s) and provide typical construction details. - Fire/smoke damper locations, installation requirements, and required access doors. Refer to CBC Section 716 and Mechanical Code Section 606.Note on the drawings CBC Section 715 requirements for a pair of doors installed in a one-hourcorridor wall. - A labeled assembly having a fire-protection rating of not less than 20 minutes. - Self-closer or automatic-closer actuated by a smoke detector. - Automatic flush bolts, the door leaf having the automatic flush bolts shall have no doorknob or surface- mounted hardware. The unlatching of any leaf shall not require more than one operation. - Full mortise hinges – three minimum. - Tight-fitting clearances and provided with a gasket so installed as to provide a seal where the door meets the stop on both sides and across the top. Clearances for a pair of swinging doors shall be as follows: With a minus 1/16” tolerance – 1/8” along the top, 1/8” along the hinge and latch jambs, 1/8”along the meeting edge of the doors, and ¼” at the bottom of the doors. - An overlapping astragal extending the full height of the doors is required along the meeting edges of the doors. A coordinating device is also required to insure proper closing.”CBC Section 1024.5.1. Doors, when fully opened, and handrails shall not reduce the required width by more than 7”. Doors in any position shall not reduce the required width by more than one-half. Other nonstructural projections such as trim and similar decorative features are permitted to project into the required width 1.5” from each side. (For door # 1055.1)Show height of the partition wall on detail 1/A12.Provide span table for metal studs.Show width and height of the glass in conference room.Show how glasses in office 1061, will be supported at the angles.Show height and width of the glass in room # 1061.Show width of the corridor.Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636. (OR See Comment #22 to #24)Provide a complete suspended ceiling system plan and section detail showing the following: - Vertical supports - Seismic wires - Seismic strut/Compression strut - Perimeter wires - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceilingThe reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)