HomeMy WebLinkAbout170904_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Separate, disabled accessible, sanitary facilities shall be provided for each gender in accordance with the California Plumbing Code (CPC) Section 412.3 and CBC Section 1115B.1.1.CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.CBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load.Glass shall be firmly supported on all four edges. Show on the drawings how compliance shall be made with CBC Section 2404. For glass not firmly supported on all four edges, design shall be submitted to the building official for approval.Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.
Note on drawings:
- CBC Section 1205.2, Natural light. The minimum net glazed area shall not be less than 8 percent of the floor
area of the room served.Note on drawings:
- CBC Section 1205.3, Artificial light. Artificial light shall be provided that is adequate to provide an average
illumination of 10’candles (107 lux) over the area of the room at a height of 30”above the floor level.Tenant improvements in the MainPlace Mall shall show compliance with the following special provisions and CBC Section 402:
- CBC Section 106.3. Tenant improvements at 2800 North Main, Main Place Mall, shall show compliance with
“Code Analysis and Fire Protection and Life Safety Concept” prepared by Code Consultants Incorporated,
dated “Revised February 18, 1986, and February 22, 1990 (1991 Mall Expansion).”
- Note on drawings: Duct and smoke removal system modification is not allowed and shall be in compliance
with the “Code Analysis and Fire Protection and Life Safety Concept.”
- Main Place Mall, other than anchor stores, is of Type IIB fire-sprinklered construction. In accordance with
CBC Section 603.1, walls and permanent partitions shall be of noncombustible construction, except that
permanent non-bearing partitions may use fire-retardant treated wood (CBC 202) within the assembly.
- CBC Section 402.4.2, Number of means of egress. When the distance of travel to the mall exceeds 75’ within
the public area of a tenant space or when the occupant load served by the exit to the mall exceeds 49, not
less than two means of egress shall be provided. The occupant load of a public sale area shall be computed
at 30 square feet per occupant. Occupant loads for other areas shall be computed in accordance with Table
Number 1004.1.1. CBC Section 402.12, Security grilles and doors. Horizontal sliding or vertical security grilles or doors, which are part of a required means of egress, shall conform to the following:
- They must remain secured in the full open position during the period of occupancy by the general public.
- Doors or grilles shall not be brought to the closed position when there are more than 10 persons occupying
spaces served by a single exit or 50 persons occupying spaces served by more than one exit.
- The doors or grilles shall be openable from within without the use of any special knowledge or effort when the
space is occupied.
- When two or more exits are required, not more than one half of the exits may be equipped with horizontal
sliding or vertical rolling grilles or doors.
- Note on Drawings: Post a legible sign at security grill/door closing controls stating “Security grill/door shall
remain secured in the full open position during the period of occupancy by the general public.”Note On Drawings: (Santa Ana Police Department Requirement)SANTA ANA POLICE DEPARTMENT REQUIREMENTS FOR MAINPLACEOVERHEAD/ROLLING GRILLESECURITYORDINANCE REQUIREMENTSTUBES ARE TO BE “DOUBLE TUBED” (NO MORE THAN ½” APART) AND CONSTRUCTED OF ½” STEELOR BE STEEL REINFORCED TUBES WITHIN 40” OF ALL LOCKING HARDWARE. PERFORATED SLATSCAN BE USED INSTEAD OF THE AFOREMENTIONED AS LONG AS THEY ARE CONSTRUCTED OF MINIMUM 20 GA STEEL.LOCKING MECHANISM TO BE STEEL SLIDEBOLTS BOTH SIDES OF DOOR. SLIDEBOLTSTO EMBED AMINIMUM OF ½” INTO THE RECEIVING GUIDE.CURTAIN GRILLES ARE NOT TO BE UTILIZED.FIRE DEPARTMENT REQUIRED EMERGENCY RELEASE MUST BE LOCATED NO MORE THAN 40” FROM THE EXTERIOR SIDE OF THE GRILLE.THE LOCKING MECHANISM’S INTERIOR THUMBTURN MUST BE SHIELDED BY AN INTERIOR HOOD TO PREVENT ITS MANIPULATION FROM THE EXTERIOR SIDE OF THEGRILLE.Change location of 2 / A4.5 on floor plan, is it for front elevation, please clarify.Identify all items on floor plan including dashed lines.Provide 1 hr separation between S2 and M.Provide MDF plywood for the shelving.Show location of 3 / A4.3 on the floor plan.For storage racks between 6’ to 8’ high provide anchoring detail.On detail 2/A6.1 and 4/A6.1 show structure above and attachment detail.Provide detail to show how ( E) opening in the corridor is being filled in.Show top connection detail for detail 5 / A6.2.Show spacing for curved metal track on detail 1/A4.2.Dimension at the store front on the mall side doesn’t match floor plan , please clarify.Show full height of the store front. Show height of inside the arch.