HomeMy WebLinkAbout172226_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.CBC Section 1133B.2.5, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.CBC Section 1110B.1.3, Check Stands CBC Table 11B-2:
NUMBER OF REGULARNUMBER TO BE
CHECKSTANDSACCESSIBLE
1 to 41- In new and existing construction, accessible check stands shall provide a clear checkout aisle width of 36”
with a maximum adjoining counter height not exceeding 38” above the finish floor.
- The top of the counter lip shall not exceed 40” above the finish floor.
- Accessible check stands shall always be open to customers with disabilities and shall be identified by a sign
clearly visible to those in wheelchairs. The sign shall display the international symbol of accessibility in white
on a blue background and shall state “This check stand to be open at all times for customers with disabilities.”Tenant improvements in the MainPlace Mall shall show compliance with the following special provisions and CBC Section 402:
- CBC Section 106.3. Tenant improvements at 2800 North Main, Main Place Mall, shall show compliance with
“Code Analysis and Fire Protection and Life Safety Concept” prepared by Code Consultants Incorporated,
dated “Revised February 18, 1986, and February 22, 1990 (1991 Mall Expansion).”
- Note on drawings: Duct and smoke removal system modification is not allowed and shall be in compliance
with the “Code Analysis and Fire Protection and Life Safety Concept.”
- Main Place Mall, other than anchor stores, is of Type IIB fire-sprinklered construction. In accordance with
CBC Section 603.1, walls and permanent partitions shall be of noncombustible construction, except that
permanent non-bearing partitions may use fire-retardant treated wood (CBC 202) within the assembly.
- CBC Sections 402.7.2 and 708. Each tenant space shall be separated from other tenant spaces by a wall
having a fire-resistive rating of not less than one hour. The separation wall shall extend from the floor to the
underside of the ceiling above.
- CBC Section 402.4.2, Number of means of egress. When the distance of travel to the mall exceeds 75’ within
the public area of a tenant space or when the occupant load served by the exit to the mall exceeds 49, not
less than two means of egress shall be provided. The occupant load of a public sale area shall be computed
at 30 square feet per occupant. Occupant loads for other areas shall be computed in accordance with Table
Number 1004.1.1. Show the front lease line.Identify horizontal stiffener, and screws on detail 4/A2.0 to support a 250 lb , point load for the grab bar.Provide engineering detail for gypsum board ceiling. Show how the top part of the entry soffit is being supported.On detail 1/A-2 , provide detail to show how glass will be supported over the soffit.