HomeMy WebLinkAbout169554_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a).
This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Provide an updated Index of drawings on cover sheet to match plans.The address of the building, and the name and address of the owner(s) and person(s) preparing the plans are required on the first sheet of the plans. (CBC 107)Provide building information on plans:
- Occupancy type: R3 / U
- Construction type: Type V – B
- Fire sprinklered: Yes / NoNote on the Drawings:
-New and existing areas to match plans.
Provide a statement on the title sheet of the plans that this project shall comply with following codes: ADD
- 2010 California Residential Code (CRC)
- 2010 California Energy Code (CEnC)
- City of Santa Ana Municipal Code
Provide building setbacks to finish of exterior walls to all property lines.
Provide eave / overhang / projection setback to all property lines.Projections of dwelling units and accessory buildings without an automatic residential fire sprinkler protection are not permitted less than 2 feet to the property line and are required to be 1 hour fire rated on the underside with a fire separation distance between 2 feet and 5 feet. (CRC Table R302.1 (1)) Walls of dwelling units and accessory buildings without an automatic residential fire sprinkler protection with a fire separation distance less than 5 feet are required to have a full one hour rating. (CRC Table R302.1 (1)) Provide wall legend to distinguish between new / existing / demo walls.Provide window and door schedule. Callout sizes and types of openings and if new or existing.Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- On each additional story of the dwelling, including basements and habitable attics but not
including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split
levels and without an intervening door between the adjacent levels, a smoke alarm
installed on the upper level shall suffice for the adjacent lower level provided that the lower
level is less than one full story below the upper level.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Bathroom or service room minimum window areas shall not be less than 3 square feet and 50% openable or, provide a mechanical ventilation system exhausted to the outside capable of providing 50 cubic feet per minute for intermittent ventilation 25 cubic feet per minute for continuous ventilation. (CRC R303.3) Glazing in door and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathrooms, showers less than 5’ above the standing surface shall have a minimum category classification of II (CPSC 16 CFR 1201). (CRC TR308.3.1 (1) & 308.4(5)) Private garage shall be separated from the residence and its attic by a minimum ½ -in gypsum board applied to the garage side. Provide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)
3”x3”x.229” steel plate washers are required on all anchor bolts in a braced wall line. (CRC R403.1.6.1)
In lieu of soils investigation report per Sections 1803.6 of the 2010 California Building Code, revise structural calculations for minimum foundation/footing design requirements for small projects as follows:
- Allowable foundation pressure not to exceed 1000 PSF.
- Footing to have minimum reinforcement of: 2 #4 at top and 2 #4 at bottom.
- The minimum depth of footings below undisturbed ground surface to be 12 inches.
- Minimum width and thickness of the footing shall comply with Table 1809.7 of the 2010 CBC.
Structural framing not using Conventional Light-Frame Construction Provisions of CRC requires the plans and calculations to be signed and sealed by an architect or civil/structural engineer. (CBC 107.3.4)
Minimum braced wall panel length shall be in accordance with CRC Table R602.10.3.1.
Provide minimum 24” clearance in front of water closet at rear bathroom.