Loading...
HomeMy WebLinkAbout174722_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceTenant improvements in the Main Place Mall shall show compliance with the following special provisions and CBC Section 402: - CBC Section 106.3. Tenant improvements at 2800 North Main, Main Place Mall, shall show compliance with “Code Analysis and Fire Protection and Life Safety Concept” prepared by Code Consultants Incorporated, dated “Revised February 18, 1986, and February 22, 1990 (1991 Mall Expansion).” - Note on drawings: Duct and smoke removal system modification is not allowed and shall be in compliance with the “Code Analysis and Fire Protection and Life Safety Concept.”Submit structural calculation for design and justification of proposed doghouse located on roof and subject to wind and seismic loads. Structural calculations and drawings, to be stamped and signed by a California licensed architect or registered civil engineer.Please incorporate the results of structural calculations into drawings prior to re-submittal.