HomeMy WebLinkAbout175028_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer. Site plan and architectural drawings. All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance Show on the plans: Occupancy Classification(s) Type of Construction Area tabulation justifying floor area(s) of building(s) (CBC Sections 503, 505, 506, 507, and 508 and CBC Table 503) Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section 506.3, required by CBC Section 903 for type of occupancy, etc.) Number, width, and purpose (cite code section) of yards required Number and fire-resistive rating of all area separation wallsIndicate plan check/permit number for new building on the site plan. All building and site accessibility compliance should be part existing permit of building.Clarify total number of parking stall on the site plan and building data showing 19 parking stalls. Indicate Occupancy and Type of construction on the drawings.Indicate distance from proposed canopy to property lines and existing sales building.Show accessible Fuel dispensing pump and compliance with Chapter 11C and Figures 11C-1 and 11C-2 of 2010 CBC.Please correct cross reference of each structural detail to correct page and reference number. Show positive connection of proposed facial to canopy. Submit two (2) copies of a geotechnical report for the subject project in accordance with CBC Section 1802. The geotechnical engineer shall include in said report applicable items noted under CBC Section 1803.6. Incorporate results of report into drawings prior to re-submittal.CBC Section 1803.6 Reports. The soil classification and design load-bearing capacity shall be shown on the construction document. Where required by the building official, a written report of the investigation shall be submitted that includes, but need not be limited to, the following information: - A plot showing the location of test borings and/or excavations. - A complete record of the soil samples. - A record of the soil profile. - Elevation of the water table, if encountered. - Recommendations for foundation type and design criteria, including but not limited to: bearing capacity of natural or compacted soil; provisions to mitigate the effects of expansive soils; mitigation of the effects of liquefaction, differential settlement and varying soil strength; and the effects of adjacent loads. - Expected total and differential settlement. - Pile and pier foundation information in accordance with Section 1810. - Special design and construction provisions for footings or foundations founded on expansive soils, as necessary. - Compacted fill material properties and testing in accordance with Section 1804.5.