Loading...
HomeMy WebLinkAbout182370_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10177657 PROJECT ADDRESS: 3400 W Segerstrom Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/14/2012 INITIAL REVIEW 11/20/2012 EXPIRATION 5/13/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Christine Peko 3. TEL: (714)224-8907 FAX: VALUATION:$6,000.00 EMAIL: cmoananu@browncoinc.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceDetails are not legible, provide clear and legible details.Calculations are not legible, provide 2 sets of calculations.Show the wind load on the calculation.Minimum 3000 psi concrete required for the pole light foundation.Please be advised , that this is not a complete plancheck correction, since the plans and calculation are not clear, more corrections might be given at the time of resubmittal.