Loading...
HomeMy WebLinkAbout182612_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10177741 PROJECT ADDRESS: 3020 W Harvard St PLAN CHECK ENGINEER: Vo, TungTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/29/2012 INITIAL REVIEW 12/18/2012 EXPIRATION 5/28/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Robert Harden 3. TEL: (714)755-5373 FAX: (714)427-6377 VALUATION:$3,120.00 EMAIL: FLOOD ZONE:X-0602320256J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments.Clearly indicate the scope of work under this building permit application: - Revise project job description on the building permit application worksheet to reflect the work to be done under the subject building permit application. - Construction drawings must clearly show all work to be done under the subject building permit application.Plan check engineer have contacted architect of records to provide complete plan, but still do not receive anything from architect since 12/18/2012. Please provide complete plan and structural calculation with complete structural details for review process. Additional correction may follow after revised plan resubmitted.