TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/14/2013
INITIAL REVIEW
1/14/2013
EXPIRATION
7/13/2013
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ken King
3.
TEL:
(501)315-7686
FAX:
VALUATION:$6,405,764.00
EMAIL:
ken@bcoandh.com
FLOOD ZONE:X-0602320277J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePlease note that each permit is required to be stand-alone permit. Accessibility and code compliance items may be duplicated for each permit. If accessibility and other overlapping code compliance items are shown on Phase 1 of project, it is required for those detail/drawings to be included as part of Phase 2 and Phase 3 of permit.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information. Please remove EMP drawings from this submittal.Reference sheet “Cover” Provide a key to identify Phase/areas that are part of this permit. Also indicate occupant load for each area on the 1st and 2nd floor including number of exits and exit width. Please refer to sheet “Cover for additional comments.Refer sheet A1.1 and provide a key or legend to identify all existing, new, removed, bearing walls versus non-bearing partitions and fire rated walls. Provide wall construction detail for each type of new wall. Provide complete attachment detail for all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Also Show compliance with CBC Section 803.Note on the floor plan the use and occupancy load of each room and/or area. Relate each use to a CBC Table item. Note occupant loads which are the greater number based on CBC Section 1004 and Table 1004.1.1 or the actual number of occupants. Show occupant load on sheet A1.1 of drawingsEgress shall not pass through kitchens, storage rooms, closets or spaces used for similar purposes.The length of a common path of egress travel in Group B, F and S occupancies shall not be more than 100’, provided that the building is equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.1. CBC Section 1014.3 & CBC Section 1014.3. Show compliant exit path of travel on sheet A1.1 of floor plan.CBC Section 1016.1. Travel distance limitations. Exits shall be so located on each story such that the maximum length of exit access travel, measured from the most remote point within a story to the entrance to an exit along the natural and unobstructed path of egress travel, shall not exceed the distances given in Table 1016.1.Table 1016.1 Exit Access Travel Distance: Show compliant exit path of travel on sheet A1.1 of floor plan.OCCUPANCYWITHOUT SPRINKLERWITH SPRINKLERSYSTEM (feet)SYSTEM (feet)
A, E, F-1, I-1, M, R, S-1200250b
B200300chere a tenant space in Group B and S occupancies has an occupant load of not more than 30, the length of a common path of egress travel shall not be more than 100’. CBC Section 1014.3.Underground tanks are not part of this permit and a separate permit is required. Please note on the drawings or remove underground tanks.Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Occupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning, or Fire Departments.Complete all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Show compliance with CBC Section 803.Identify location of B and S-1 occupancies on the floor plan of drawings and show occupancy separation based on Table 508.4 of 2010 CBC.Provide on the drawings a complete door schedule, showing:
- Door sizes (CBC Sections 1008.1.1 and 1133B.2)
- Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and
1133B.2.5)
- Compliance with limitation of viewport size (CBC Section 715.4.3 Exception 1)
- Fire-rating of door assembly complying with CBC Section 715 Opening Protection)CBC Section 1008.1.8, Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”All doors require a level floor landing on each side in accordance with CBC Sections 1008.1.4, 1008.1.5, 1008.1.6, and 1133B.2.4 and CBC Figures 11B-26A and 11B-26B. Provide typical door threshold details and details of change in floor covering material.The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. CBC Section 1126A.3.2.Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. CBC Section 1133B.2.5.2.The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position. CBC Section 1126A.3.1.CBC Section 1133B.2.5, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.CBC Section 1127B.3, All building entrances that are accessible to and usable by persons with disabilities shall be identified with a least one standard sign and with an additional directional signs, as required, to be visible to persons along approaching pedestrian ways.CBC Section 1133B.2.6, Required the bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrest without creating a trap or hazardous condition.Refer to the attached entrance/door handout. Revise the drawings to show compliance.Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.CBC Section 1011.1. Provide a directional exit sign at changes in exiting direction.CBC Section 1011, Requires exit signs to be readily visible from any direction of approach. No point shall be more than 100’ from the nearest visible exit sign. Revise the drawings to show compliance.CBC Section 1006, Requires means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”
- Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual
exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”
- Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”For the purpose of Section 1011.3, the term “tactile exit signs” shall mean those required signs that comply with Section 1117B.5.1, Item 1.CBC Section 1114B.1.2, 1114B.1.3. and 1129B.3, Item 3. Entrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.CBC Section 1127B.1. Site development shall be designed to provide access to all entrances and exterior ground-floor exits and access to normal paths of travel; and where necessary, to provide access shall incorporate pedestrian ramps, curb ramps, etc.At every entrance and at every major junction along or leading to an accessible route of travel, there shall be a sign displaying the international symbol of accessibility. Signs shall indicate the direction to accessible building entrances and facilities and shall comply with the requirements found in CBC Sections 1117B.5 and 1127B.3.CBC Section 1133B.8.2. Any obstruction that overhangs a pedestrian’s way shall be a minimum of 80” above the walking surface as measured from the bottom of the obstruction.(When applicable) If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5.
Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Refer to the attached handout for Exterior Routes of Travel. Revise drawings to show compliance.Provide parking data on the site plan showing the total number of parking spaces provided, the number of disabled accessible spaces and the number of van accessible spaces, showing compliance with CBC Section 1129B and CBC Table 11B-6.Refer to the attached parking handout for additional plan check comments. Revise the drawings to show compliance.Plumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1.Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section1115B.Separate, disabled accessible, sanitary facilities shall be provided for each gender in accordance with the CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Drinking fountains serving the area of new work shall be accessible. CBC Section 1115B.4.6 and California Plumbing Code Section 406.5.Refer to the attached sanitation facility handout for additional plan check comments. Revise plans to show compliance.Provide elevation of each counter to show compliance with CBC Section 1122B.1. Where a single counter contains more than one transaction station, such as (but not limited to) a bank counter with multiple teller windows or a retail sales counter with multiple cash register stations, at least 5 percent, but never less than one, of each type of station shall be located at a section of counter that is at least 36” long and no more than 28 to 34” high.- Provide a minimum 30” x 48” wheelchair clear floor space.
- Provide knee space at tables at least 27” high, 30” wide and 19” deep.
- Provide height of tables between 28” – 34” from the floor ground.CBC Section 1123B. Refer to the attached handout on Access to Employee Areas. Provide compliance on the drawings.CBC Section 1122B. Refer to the attached handout on fixed or built-in, seating, tables and counters. Provide compliance on the drawings.CBC Section 1117B.8,Change Rooms:
- Where fitting or dressing rooms are provided for male or female customers, patients, employees, or the
general public, 5 percent, but never less than one, of dressing rooms for each type of use in each cluster of
dressing rooms shall be accessible.
- Entry doors shall conform to the requirements of Section 1133B.2 and aisles leading to such doors shall
conform to Sections 1133B.6.1 and 1133B.6.2.
- The bottom of mirrors provided for use by persons with disabilities shall not be greater than 20” from the floor.
Mirrors to be used by persons with disabilities shall be full-length, measuring at least 18” wide by 54” high, and
shall be mounted in a position affording a view to a person on the bench as well as to a person in a standing
position.
- Clothing hooks shall be located not greater than 8” from the floor.
- Every accessible dressing room shall have a 24” by 48” bench fixed to the wall along the longer dimension.
The bench shall be mounted 17 to 19” above the finish floor. Clear floor space shall be provided alongside the
bench to allow a person using a wheelchair to make a parallel transfer onto the bench. The structural strength
of the bench and attachments shall comply with Section 1115B.8. The minimum clear space within the room
shall be 60” width and length. No door shall encroach into the required space.Reference sheet A3.0, Provide attachment detail for ACM panels. Provide material specifications including weight of material. Structural calculations for design and justification may be required. Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636.The reflected ceiling plan and details must show compliance with CBC Sections 711.3.1, 803, 1613, and 1705 (special inspection) for suspended ceiling systems.Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.
Note on drawings:- CBC Section 1205.2, Natural light. The minimum net glazed area shall not be less than 8 percent of the floor
area of the room served.Note on drawings:- CBC Section 1205.3, Artificial light. Artificial light shall be provided that is adequate to provide an average
illumination of 10’candles (107 lux) over the area of the room at a height of 30”above the floor level.Provide on the drawings a complete window schedule showing:
- Window sizes
- Type and thickness of glazing (type of safety glazing for hazardous locations noted under CBC Section 2406.3Glass and glazing shall be in accordance with CBC Chapter 24. Note on the drawings all windows and doors having glazing. Indicate the type and thickness of each light of glazing on the drawings.Note type of safety glazing complying with CBC Section 2406 for hazardous locations listed under CBC Section 2406.3.Note type of safety glazing complying with CBC Section 2406 for glazing in fixed or operable panels adjacent to a door where the nearest exposed edge of the glazing is within a 24” arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60” above the walking surface.Reference sheet A3.0, provide positive connection for “Furr-Down” at detail parts door. Structural calculations for design and justifications are required.Reference sheet A5.0, provide cross reference from floor plan and site plan. Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for:
- New opening(s) in bearing wall(s)
- Wall detail #4 on sheet A5.0 of drawings.
- New foundation shown for wall detail # 3 on sheet A5.0 of drawings.
- Veneer construction, when weight exceed requirements of Section 1405 of CBCProvide complete details on the drawings showing compliance with CBC Section 1405 requirements for veneer construction.Provide roof framing plan of existing building to show location of proposed equipment. Show positive connection from equipment platform to roof and equipment. Indicate weight of each unit on the drawings. Structural calculation for design and justification is required if weight of each piece of equipment exceeds 400lbs.