HomeMy WebLinkAbout182147_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10177593 PROJECT ADDRESS: 2800 N Main St Unit# 908 PLAN CHECK ENGINEER: Vo, TungTEL:714 647-5830FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/1/2012 INITIAL REVIEW 11/27/2012 EXPIRATION 4/30/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Kip Robinson 3. TEL: (951)515-9119 FAX: VALUATION:$26,300.00 EMAIL: kip@skylineismygc.com FLOOD ZONE:X-0602320163J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - It is the project designer’s responsibility to coordinate work with the various trades to ensure that the size of the wall cavity will be large enough to accommodate piping, fittings, ducts, etc. There has been a continuing field problem of 2½” wide metal studs not being able to accommodate plumbing pipes. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Provide on the drawings details for the lateral support of partitions, rails and similar space dividers less than 5’ 9” in height. - Note type, size, and spacing of fasteners. - Heights of partition, suspended ceiling, structure above.Complete all soffit and furred out wall details. Provide complete detailing, including number, type, location of fasteners and how attachment is made to the building structure. Show compliance with CBC Section 803.Provide a complete suspended ceiling system plan and section detail showing the following: - Separate fixture wires for lights and mechanical devices - ICC Research Report number for the suspended ceiling Please see additional corrections on plan and calculation. Additional corrections may follow when revised plan resubmitted.