HomeMy WebLinkAbout181847_3_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
PROJECT ADDRESS:
PLAN CHECK ENGINEER:TEL:714FAX:714
647-5897
TYPE OF CONSTRUCTION:
OCCUPANCY CLASSIFICATION(S):
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
INITIAL REVIEW
EXPIRATION
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
3.
TEL:
FAX:
VALUATION:
EMAIL:
FLOOD ZONE:
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- On each additional story of the dwelling, including basements and habitable attics but not
including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split
levels and without an intervening door between the adjacent levels, a smoke alarm
installed on the upper level shall suffice for the adjacent lower level provided that the lower
level is less than one full story below the upper level.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.
Show location of underfloor access crawl hole (18 x 24 inches). (CRC R408.4)
Please clarify if the fire place and chimney are new or existing.
No Wood burning fire place allowed per AQMD.
Provide framing detail for new exterior opening (bay window) and fire place.
Width of the new foundation on the foundation plan is 15” and on detail 1/S1 shows 12”, please revise it accordingly.
Provide complete detail for the shear transfer and boundary nailing for the plywood. On all the details.
How would new basement wall being placed without all the dirt.
Show underfloor ventilation opening size and location equal to 1 sf.ft for each 150 sq.ft of underfloor area.
Engineer of record to verify the soils condition and provide a report , prior to pouring foundation.
Show minimum 18-inch under floor clearance from grade to the bottom of floor joists and minimum 12 inch clearance to bottom of girders.