HomeMy WebLinkAbout183862_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10178094
PROJECT ADDRESS:
1404 S Village Way
PLAN CHECK ENGINEER:
Vo, TungTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/5/2013
INITIAL REVIEW
3/7/2013
EXPIRATION
8/4/2013
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Bob Pinault
3.
TEL:
(714)632-9441
FAX:
VALUATION:$100,000.00
EMAIL:
bob@rdpinaultcompany.com
FLOOD ZONE:X-0602320277J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.Please return marked up set of drawings with corrections.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)CBC Section 1004.3, Posting of occupant load. Every room or space that is assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”At every entrance and at every major junction along or leading to an accessible route of travel, there shall be a sign displaying the international symbol of accessibility. Signs shall indicate the direction to accessible building entrances and facilities and shall comply with the requirements found in CBC Sections 1117B.5 and 1127B.3.CBC Sections 1102B, 1124B.1 and 1127B.1. Provide a continuous walking surface from each exit door to public way.Plumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1.Sanitary facilities serving the area of new work shall be disabled accessible. Revise the drawings to show compliance with CBC Section1115B.Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 1115B and the California Plumbing Code.CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.CBC Section 1115B.4.3 Item 4. Note on the drawings hot water and drain pipes under lavatory shall be insulated.Provide a table on the drawings showing number of employees by gender, the number of each type of fixture required and the number of each type of fixture provided.Ensure sanitary facilities comply with CBC Section 1115B.8.1 and that the bottom of the mirror is no higher than 40” from the floor.CBC Section 1117B.8, Fitting and Dressing Rooms:
- Where fitting or dressing rooms are provided for male or female customers, patients, employees, orthe
general public, 5 percent, but never less than one, of dressing rooms for each type of use in each cluster of
dressing rooms shall be accessible.
- Entry doors shall conform to the requirements of Section 1133B.2 and aisles leading to such doors shall
conform to Sections 1133B.6.1 and 1133B.6.2.
- The bottom of mirrors provided for use by persons with disabilities shall not be greater than 20” from the floor.
Mirrors to be used by persons with disabilities shall be full-length, measuring at least 18” wide by 54” high, and
shall be mounted in a position affording a view to a person on the bench as well as to a person in a standing
position.
- Clothing hooks shall be located not greater than 8” from the floor.
- Every accessible dressing room shall have a 24” by 48” bench fixed to the wall along the longer dimension.
The bench shall be mounted 17 to 19” above the finish floor. Clear floor space shall be provided alongside the
bench to allow a person using a wheelchair to make a parallel transfer onto the bench. The structural strength
of the bench and attachments shall comply with Section 1115B.8. The minimum clear space within the room
shall be 60” width and length. No door shall encroach into the required space.
- Exceptions:- Minor specialized display areas that do not exceed 200 square feet in floor area and to which the general public is excluded need not be made accessible.- Offices in sales facilities that do not exceed 5,000 square feet in total area, that are located on non-accessible levels, need not be made accessible.
Please see additional corrections on plan and calculation. Additional corrections may follow when revised plan resubmitted.