HomeMy WebLinkAbout184416_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10178256 PROJECT ADDRESS: 214 S Grand Ave PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/14/2013 INITIAL REVIEW 4/10/2013 EXPIRATION 11/10/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Robert Mograbi 3. TEL: (714)836-5825 FAX: VALUATION:$50,000.00 EMAIL: chef.roberts@yahoo.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Plans are incomplete, provide all the engineering and construction details that discussed in the meeting.5/23/2013Provide detail for the new opening between the unit, if there is an existing opening, it is unpermitted, provide detail to legalize it.Please fill out attached Disabled accessible compliance form.Show the bathrooms are in compliance with disabled access requirements.Enlarge path of travel to show the curb ramp and landing and the truncated dome is in compliance with disabled accessible.Provide complete plans and calculations signed and stamped by engineer , per LARR25747 report for the walk in cooler.Provide 1-hr separation for furnace room per table 508.2.5.Provide height of the dehydration exhaust channel above the roof line for 3 feet high and over provide calculation and bracing detail due to wind load.On roof framing plan there is structural modification next to 8’x5’ opening, please clarify is there another opening?Please verify if 1-hr shaft is required due to high temperature equipment, if it is provide engineering calculation and complete construction detail.