PLAN CHECK NO:
10178660-62
PROJECT ADDRESS:
2447 N Heliotrope Dr
PLAN CHECK ENGINEER:
Vo, TungTEL:714
647-5830FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/2/2013
INITIAL REVIEW
5/28/2013
EXPIRATION
10/29/2013
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ken Wiant
3.
TEL:
(714)721-8931
FAX:
VALUATION: $35,662.00
EMAIL:
ken@architectsoc.com
FLOOD ZONE: X-0602320163J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5830 for an appointment.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments and to clearly indicate the scope of work under this building permit application. There may be additional requirements when complete construction drawings and supporting data is submitted for Building Safety Division review.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
-Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
Prior to the issuance of building permit(s), tract maps, parcel maps, lot line adjustments, public way abandonments, covenant, conditions and restrictions (CC&R's), etc., related to the subject project must be legally recorded with the County of Orange.
Provide a statement on the title sheet of the plans that this project shall comply with following codes:
- 2010 California Residential Code (CRC)
- 2010 California Building Code (CBC)
- 2010 California Electrical Code (CEC)
- 2010 California Mechanical Code (CMC)
- 2010 California Plumbing Code (CPC)
- 2010 California Green Building Standards Code (CGBS) or CALGreen
- 2010 California Energy Code (CEnC)
- City of Santa Ana Municipal Code
List all deferred submittals on cover sheet. (CRC R106.3.3)Provide window and door schedule. Callout sizes and types of openings and if new or existing.Show 30-inch clear width for water closet compartments and 24-inch clearance in front of a water closet. Show location of heating equipment on the plans. (CRC R303.8)Carbon monoxide alarms combined with smoke alarms shall comply with both sections R314 and section R315, all applicable standards, and requirements for listing and approval by the Office of the State Fire Marshal, for smoke alarms.All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. (CRC R314.3) Smoke alarms shall be installed in the following locations:
- In each sleeping room.
- Outside each separate sleeping area in the immediate vicinity of the bedrooms.
- On each additional story of the dwelling, including basements and habitable attics but not
including crawl spaces and uninhabitable attics. In dwellings or dwelling units with split
levels and without an intervening door between the adjacent levels, a smoke alarm
installed on the upper level shall suffice for the adjacent lower level provided that the lower
level is less than one full story below the upper level.
- When more than one smoke alarm is required to be installed within an individual dwelling
unit the alarm devices shall be interconnected in such a manner that the actuation of one
alarm will activate all of the alarms in the individual unit.All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315)
- Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for
which the permit was obtained. Carbon monoxide alarms required by Sections R315.1 and
R315.2 shall be installed in the following locations: ________.
- Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s).
- On every level of a dwelling unit including basements.
- Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or
within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm
shall activate all of the alarms in the individual unit.
Exception:
Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.Provide details of the deck/balcony and specify method of waterproofing. List ICC approval number for decking material. Show two percent minimum slope. (CRC R905.10.1)Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. Bathroom or service room minimum window areas shall not be less than 3 square feet and 50% openable or, provide a mechanical ventilation system exhausted to the outside capable of providing 50 cubic feet per minute for intermittent ventilation 25 cubic feet per minute for continuous ventilation. (CRC R303.3) Specify manufacturer's name and ICC approval number for skylights. (CRC R308.6.9) Specify glazing material shall be fully tempered, heat-strengthened, wired, approved rigid plastic, or laminated in accordance with CRC R308.6.2. Provide skylight details to show flashing and 4-inch minimum mounting height. (CRC 308.6.8) Submit calculations, specifications, and construction details for skylights that are not third party approved. Private garage shall be separated from the residence and its attic by a minimum ½ -in gypsum board applied to the garage side. Garages beneath habitable rooms shall be separated from all habitable rooms above by not less than a 5/8-in type X gypsum board. (CRC R302.6) Structure(s) supporting floor/ceiling assemblies used for separation required by CRC Section R302.6 shall be protected by a minimum ½ -in gypsum board applied to the garage side.Provide the minimum 1-3/8 inch solid-core wood door, a solid or honeycomb core steel door not less than 1-3/8 inch thick, or a 20-minute fire rated door between the garage and residence unless both are protected by an automatic residential fire sprinkler system. (CRC R302.5.1) Provide a complete full-height section and details of stairway showing: (CRC R311.7)
- Maximum rise of 7¾ inches and minimum run (tread) of 10 inches.
- Minimum width of 36 inches.
- Minimum headroom of 6 feet 8 inches.
- Framing (stringer, landing, etc.) size, bracing, connections, footings.
- Stairways positively anchored to the primary structure without using toe nails or nails subject to
withdrawal.
- Enclosed usable space under a stairway requires ½ inch gypsum board on the enclosed side. (CRC
R302.7)Show a ½ inch gypsum board at enclosed space under the stairway. (CRC R302.7) Handrails are required on at least one side of a continuous run of treads or flight with four or more risers. (CRC R311.7.7) The top of handrails shall be placed not less than 34 inches nor more than 38 inches above the nosing of the treads. A clear space of 1-1/2 inches is required between the handrail and the wall.Provide dimensioned details of handrail grips showing a minimum edges radius of 0.01 inch and shall have a one of the following:
- Circular cross sectional diameter shall be between 1 ¼” and 2”. Non-circular handrails shall have
a perimeter dimension between 4 and 6 ¼ inches with a maximum cross section of dimension of
2 ¼ inches. (CRC R311.7.7.3 (1))
- Handrails with a perimeter dimension > 6 ¼ inches shall have a graspable finger on both sides of
the profile between 1 1/4” to 2 ¾” beginning within ¾” from the top of the profile and achieve a
minimum 5/16” depth within 7/8” below the widest profile point and shall continue a minimum 3/8”
to a level not less than 1¾” below the tallest portion of the profile. (CRC R311.7.7.3 (2)) Provide a 42 inch high guardrail at balconies, landings and decks located more than 30” vertically to the floor or grade below. (CRC R312.1 & R312.2) Provide detail of the guard showing that a 4” diameter sphere may not pass through any opening in the guard. (CRC R312.3)Where guards are used as handrails, provide a detail of the guard (including a handrail on open sides of the stairway) showing that a 4 3/4” diameter sphere may not pass through the open space between intermediate rails and pickets. The open space between the riser tread and bottom rail of the guard shall not allow a 6-inch diameter sphere to pass through. (CRC R312.3) Provide detail of roof construction assembly. (CRC 902.1) Specify ICC approval number and weight per square foot for roof coverings. (CRC R905.3.4 and R905.3.5) Provide detail at eave vents to show a minimum 1” space between the insulation and bottom of the roof sheathing. (CRC R806.3) Show exterior wall construction assembly. A minimum of one layer of No. 15 asphalt felt, free from holes and breaks, complying with ASTM D 226 for Type 1 felt shall be applied over studs of all exterior walls. Specify that two layers of Grade D or 60 minute Grade D paper shall be applied over all wood base sheathing. (CRC R703.2) Specify a minimum 0.019” (No. 26 galvanized sheet gage) corrosion-resistant or plastic weep screed located below foundation plate line and 4 inches above grade on all exterior stud walls or 2-inches above paved areas. (CRC R703.6.2.1) Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered Civil Engineer for:
- Stairway(s).
- Handrail(s)/Guard(s).
- Guard(s).
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
- Signed Energy Efficiency Documents must be printed on the plans.
- Also, submit 2 copies of signed Energy Efficiency calculations.
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant
who is qualified to perform an energy efficiency analysis in accordance with the California Code
of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2008 California Energy Code).
The plan check consultant must sign documentation certifying that a thorough, competent review
has been performed on behalf of the Enforcement Agency.
- The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.
-The energy plan check consultant must sign documentation forms on behalf of the Building
Safety Division.
- The energy plan check consultant must also complete the attached “Energy Conservation
Plan Check Consultant Qualification Statement”.
- Refer to the attached public handouts titled “Energy Efficiency Compliance” and “Energy
Efficiency Compliance Documentation”.
- Clarify location and size of all existing and new windows on the drawings. Revise T-24
energy calculations to show compliance.
- Please refer to attached Residential Lighting Design Guide and revise drawings to show
compliance.Because of special conditions, the City is requiring the construction documents to be prepared by a licensed design professional. CGBC 102.1The constructions documents shall provide sufficient clarify to indicate the location, nature, and scope of the proposed green building features. CGBC 102.2Plans shall indicate method of verification of compliance with all CALGreen requirements. Third party or other methods shall demonstrate satisfactory conformance with mandatory measures. Include City's Mandatory Measures Checklist copies onto plans.In mixed occupancy buildings, each portion of a building shall comply with the specific green building measures applicable to each specific occupancy.Storm Water Drainage and Retention. Submit storm water drainage plans for projects < 1 ac. Plans shall indicate how to manage storm water drainage during construction utilizing one or more of the following measures: 1. Use of retention basins of sufficient size to retain storm water on-site; 2. By filtering storm water with a barrier system, wattle, or other approved method when storm water is conveyed to a public drainage system, collection point, gutter, or similar disposal method; 3. By complying with a lawfully enacted storm water management Ordinance. CGBC 4.106.2 Surface drainage. Submit surface drainage plans to indicate how surface water shall not enter buildings. Examples of methods to manage surface water include: 1. Swales; 2. Water collection; 3. French Drains; 4. Water retention gardens; 5. Other water measures which keep surface water away from buildings and aid in groundwater recharge. CGBC 4106.3Provide documentation to indicate the project meets the requirements of State mandatory energy efficiency standards. CGBC 4201.1Illustrate that potable water use is reduced by at least 20 percent. CGBC 4303.1 Indicate the method of compliance, either prescriptive or performance. Note: Residential reduction not required until July 1, 2010.Provide "Baseline Water Use" document (WS-l)Provide 20% Reduction Water Use document (WS-2)Both WS-l and WS-2 shall be submitted as part of the plan check approval process.Indicate on plans method of showing field verification either by installer or third party.Plumbing fixtures and fittings shall meet the standards referenced in CGBC Table 4.303.3. CGBC 4303.3Sec. 4.304 Irrigation controllers shall meet the requirements of CGBC 4.304.1.
- Indicate on the plans the type of controllers and the location.
- Note: Field verify controller installation when the controllers are installed by the contractor at time
of building final.Seal openings in the building envelope in compliance with the California Energy Code (CEC). Annular spaces around pipes, electric cables, conduits or other openings in plates at exterior walls shall be protected by closing such openings with cement mortar, concrete masonry, or a similar method acceptable to the enforcing agency. CGBC 4.406.1Reduce construction waste by recycling or salvaging for re-use a minimum of 50 percent of the nonhazardous construction and demolition debris, or meet the local construction and demolition waste management ordinance, whichever is more stringent. CGBC 4.408.1kfj Indicate on the plans that a construction waste management plan and documentation demonstrating compliance with the plan shall be submitted that:
- Identifies the materials to be diverted from disposal by recycling, reuse on the project or salvage
for future use or sale.
- Specifies if materials will be sorted on-site or mixed for transportation to a diversion facility.
- Identifies the diversion facility where the material collection will be taken.
- Identifies construction methods employed to reduce the amount of waste generated.
- Specifies that the amount of materials diverted shall be calculated by weight or volume, but not by
both. CGBC 4.408.2, 4.408.2.1Note on the drawings that an Operation and Maintenance Manual with content per CGBC 4.410.1 and in a format acceptable to the enforcing agency shall be placed in the building at the time of final inspection. CGBC 4.410.1. Refer to RCD residential guide for manual format and suggested content.Gas fireplaces to be direct-vent sealed-combustion type. Woodstoves or pellet stoves shall comply with U.S. EPA Phase II emission limits. CGBC 4.503.1 Note: reference SCAQMD Rule 445.All duct openings and other air distribution component openings shall be protected during storage on the construction site until final start-up with tape, plastic, sheet metal, or other acceptable methods to reduce the amount of dust and debris which may collect in the system. CGBC 4.504.1Finish materials shall comply with COBC 4.504.2. Adhesives, adhesive bonding primers, adhesive primers, sealants, sealant primers, and caulks shall comply with local or regional air pollution control or air quality management district rules where applicable, or meet the requirement of SCAQMD Rule 1168 VOC limits and prohibition on the use of certain toxic chemicals, except per subsection 2. COBC 4.504.2.1, subsection 1Note on the plans that aerosol adhesives, smaller unit sizes of adhesives, and sealant or caulking compounds (in units of product, less packing, which do not weigh more than 1 pound and do not consist of more than 16 fluid ounces shall comply with statewide VOC standards and other requirements, including prohibitions on the use of certain toxic compounds, of CCR, Title 17, commencing with Section 94507. 4 CGBC.504.2.1, subsection 2VOC Content Limits for Architectural Coatings (Architectural Paints) shall comply with CGBC Table 4.504.3.Aerosol paints and coatings shall meet the requirements of Sections 94522(a)(3), 94522(c)(2), and (d)(2) of California Code of Regulations, Title 17 commencing with Section 94520. CGBC 4.504.2.3Verification of compliance with finish materials shall be provided at the request of the enforcing agency. Documents may include, but not limited to the following:
- Manufacturer's product specification.
- Field verification of on-site product containers.
- Other methods approved by the local jurisdiction.Carpets shall meet one of the following: 1. Carpet and Rug Institute's Green label plus program, 2. California Department of Public Health Standard Practice for the testing of VOCs (Specification 01350), 3. NSF/ANSI 140 at the Gold Level. 4. Scientific Certifications Systems Indoor AdvantageTM Gold. CGBC 4.504.3Carpet cushion shall meet the requirements of the Carpet and Rug Institute Green Label Program, carpet adhesive shall meet the requirements of CGBC Table 4.504.1. CGBC 4.504.3.1,4.504.3.2For resilient flooring, at least 50 percent of the floor area shall comply with VOC emission limits defined in the Collaborative for High Performance Schools (CHPS) Low-emitting Materials List or certified under the Resilient Floor Covering Institute (RFCI) FloorScore program. CGBC 4.504.4Hardwood plywood, particleboard, and medium density fiberboard composite wood products shall meet the requirements for Formaldehyde Limits in CGBC Table 4.504.5.Note on the plans that documentation shall be provided to indicate compliance with CGBC 4.504 and shall include at least one of the following: Product certifications and specifications, chain of custody certifications, or other methods acceptable to the enforcing agency. CGBC 4.504.5.1Concrete slab foundations required to have a vapor retarder by CBC, CCR Title 24, Part 2, Chapter 19 shall also comply with this section. Provide a Capillary Break installed in compliance with one of the following:
- A 4-inch thick base of 112-inch or larger clean aggregate, with a vapor barrier in direct contact
with concrete, and a concrete mix design which will address bleeding, shrinkage, and curling.
- Other equivalent methods approved by the enforcing agency.
- A slab design specified by a licensed design professional. CGBC 4.505.2.1
- Reference ACI 302.Add a note to plans the building materials with visible signs of water damage shall not be installed. CGBC 4.505.3Moisture content of Building Materials, and verification, shall meet the requirements of CGBC 4.505.3.Bathroom exhaust fans shall be ENERGY STAR compliant, ducted to terminate outside the building, and controlled by a humidistat capable of being adjusted between the relative humidity range of 50 to 80 percent. CGBC 4.506Covers for whole house exhaust fans shall have a minimum insulation value of R-4.2 and close when the fan is off. CGBC 4.507.1
Heating and air-conditioning system design shall be sized, designed and have their equipment selected using the following methods: CGBC 4.507.2
- Heat loss and heat gain is established according to ACCA Manual J, ASHRAE handbooks or
other equivalent design software or methods.
- Duct systems are sized according to ACCA 29-D Manual D, ASHRAE handbooks or other
equivalent design software or methods.
- Select heating and cooling equipment according to ACCA 36-S Manual S or other equivalent
design software or methods.
Specify that inspections are required for certification of all CALGreen features in the plans and listed on Mandatory Measures Lists. Submit the name and qualifications of the person or persons anticipated to perform the inspections.
- The following credentials are required _______________________
- An oral and written exam is required to obtain the special inspection credential
Submit the following forms/worksheets:
- WS-1, Baseline Water Use
- WS-2, 20 Percent Reduction Water Use
- Construction Waste Management Plan
- Construction Waste Management Worksheet
- Construction Waste Management AcknowledgmentSubmit an acoustical analysis report in accordance with the California Building Code Section 1207- Sound Transmission Control. The drawings shall incorporate all acoustical analysis report recommendations. (This requirement does not apply to detached single-family dwellings.)Show exhaust hood and exhaust vent above cooking appliances at the kitchen. (CMC 504.2) Provide water heater anchor straps within the upper and lower 1/3. (CPC 508.2) All 15- and 20- ampere, 125- and 250-volt non-locking receptacles that are installed on the exterior of a dwelling unit and located in damp or wet locations, shall be listed as weather-resistant type. (CEC 406.8(A) (B))
Correction is ready to pick up at the counter. Please see additional corrections on plan and calculation. Additional corrections may follow when revised plan resubmitted.