Loading...
HomeMy WebLinkAbout184766_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10178378 PROJECT ADDRESS: 1626 W Marion Way PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/21/2013 INITIAL REVIEW 4/8/2013 EXPIRATION 9/17/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Ricardo Flores 3. TEL: (562)622-4888 FAX: VALUATION: $4,250.00 EMAIL: floresrick27@verizon.net FLOOD ZONE: X-0602320144J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.All persons preparing plans for others shall sign those plans. Business and Professions Code Chapter 3, Division 3, Section 5536.1 (a). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. Provide complete project description with detailed description of scope of work.The maximum U-factor for glazing is 0.40 for Climate Zones 6 thru10 for Package D. Revise plans to show compliance.The minimum Solar Heat Gain Coefficient (SHGC) is 0.4 for Climate Zones 6 thru 10 for Package D.Provide beam for the new opening.Provide strap at the top plate to opening.Section A-A shows 2x10 C.j and framing plan show 2x6, please clarify.Provide attachment detail to show the shear transfer from the new addition to existing sfd.Remove details that are not relate to this project.