Loading...
HomeMy WebLinkAbout186047_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10178786 PROJECT ADDRESS: 202 N Euclid St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/20/2013 INITIAL REVIEW 5/25/2013 EXPIRATION 11/16/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Hai Ngo 3. TEL: (714)548-8486 FAX: (714)898-9694 VALUATION:$10,000.00 EMAIL: ngovinhhai@yahoo.com FLOOD ZONE:A-0602320252J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceOn detail 2/SD-4 providenailer for the sheathing on the top of the steel beam.On detail 3 /SD-4 and 4/SD-4 continue the plywood all the way to the 2-2xRR and show the nailing.On detail 1/SD-4 attachment of 4x 16 beam to the steel post is not clear .