Loading...
HomeMy WebLinkAbout186939_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10179088 PROJECT ADDRESS: 3 E MacArthur Pl Unit# 790 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: I A, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/24/2013 INITIAL REVIEW 7/6/2013 EXPIRATION 12/21/2013 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Tricia Ann Pilkerton 3. TEL: (949)724-1499 FAX: VALUATION:$48,500.00 EMAIL: tricia@spaces-oc.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables 601, 602, and 704.8.Provide on the drawings a complete door schedule, showing: - Door sizes (CBC Sections 1008.1.1 and 1133B.2) - Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and 1133B.2.5)CBC Section 1133B.2.5.1, Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.CBC Section 1114B.1.2, 1114B.1.3. and 1129B.3, Item 3. Entrance(s) to the building or facility and primary path of travel to the specific area of new work, alteration, structural repair or addition shall be accessible. Path of travel incorporated all elements from the exterior arrival site to remodeled area.Complete the attached Disabled Accessibility Documentation Form.Show bottom track gauge for the partition walls.Show minimum 18” clearance to the strike edge of the door.Provide detail how glazing in room #792 being supported laterally.Provide thickness and size of the glazing.