PLAN CHECK NO:
10379503
PROJECT ADDRESS:
1912 E McFadden Ave
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
8/20/2013
INITIAL REVIEW
8/20/2013
EXPIRATION
2/16/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Vince Cataldo
3.
TEL:
(714)872-9118
FAX:
VALUATION:$44,336.00
EMAIL:
Vince@socalvacuum.net
FLOOD ZONE:X-0602320277J
APPLICABLE CODE: 2010CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Please return marked up set of drawings with corrections.(when meeting is needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. (FYI) Please remove MEP sheets from drawings. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuancePlease provide scaled (1/4”=1’.0”) and complete floor plan and label each room use and indicate material name to be stored in the warehouse. Note material name to be shown in the show room.Identify location of property lines on the drawings.Provide door schedule on the drawings and call out size of each door, showing: - Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and 1133B.2.5)The width of the level area on the side to which the door swings shall past the strike edge of the door by 18” for interior doors. CBC Section 1126A.3.2.Call 2x4 ceiling joist and note on the drawings NO STORAGE ABOVE.Provide enlarged toilet room floorplan and refer to attached handouts for additional plan check comments. Revise drawings to show compliance.Identify next door tenant that are not part of this permit.Indicate total occupant load of this floor based on office and conference room occupant load factor based on Table 1004.1.1 of CBC on the drawings. Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsPriority shall be given to those elements that will provide the greatest access in the above order.Valuation of proposed project is calculated as $44336.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Section 1134B. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.
Provide parking data on the site plan showing the total number of parking spaces provided the number of disabled accessible spaces and the number of van accessible spaces, showing compliance with CBC Section 1129B and CBC Table 11B-6. Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.
Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”
Please refer to Section 412.3 of CPC and show total occupant load of 10 or less based on Table A and show calculation for occupant load and floor area of less than 1500 SF for justification of one toilet room. Show two toilet rooms if project does not fall under Exception of Section 412.3 of CPC
Plumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1. Provide occupant load calculations to show compliance with Table A and Section 402.3 of CPC for justification of 1 toilet room.
(When applicable) CBC Section 1122B.1. Where counter are provide, one of each type is required to be accessible. At least 5 percent, but never less than one, of each type of station shall be located at a section of counter that is at least 36” long and no more than 28 to 34” high.
- Provide a minimum 30” x 48” wheelchair clear floor space.
- Provide knee space at tables at least 27” high, 30” wide and 19” deep.
- Provide height of tables between 28” – 34” from the floor ground.
- Provide access to accessible seating space(s) by aisles with a minimum of 36” in width. CBC Section 1133B.2.5, Note on the drawings: (All existing and new doors) “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.CBC Section 1127B.3, All building entrances that are accessible to and usable by persons with disabilities shall be identified with a least one standard sign and with an additional directional signs, as required, to be visible to persons along approaching pedestrian ways.
(FYI) It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. City of Santa Ana does not have jurisdiction to enforce ADA compliance and it is the responsibility of designer. If applicable please remove notes referring to ADA compliance from drawings. This project is reviewed for compliance with State Accessibility Standards.
If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5. Show locations on the site reference drawings.Provide truncated dome at zero curb locations between existing building and vehicle traffic area.
Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use.
Note on drawings: - Provide mechanical ventilation for each area/room in accordance with the 2010 California Mechanical Code.Note on drawings: Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.