HomeMy WebLinkAbout189645_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10179886 PROJECT ADDRESS: 3030 S Redhill Ave PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/15/2013 New floor area. INITIAL REVIEW 10/17/2013 EXPIRATION 4/13/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Amber Moffett 3. TEL: (714)385-1835 FAX: VALUATION:$100,000.00 EMAIL: amber@peica.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3corrected sets of plans. Please refer to drawings for additional plan check comments. Return marked up set of drawings with corrections.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings (647-5839 or 647-5700) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSchool District Compliance Certificate; a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of work. (New floor area of 2742 SF as called out by applicant on the drawings to be verified).Indicate roofed floor area of proposed addition for school fees and floor area justification. Clarify discrepancy between application, architectural and structural drawings. Please correct building addition floor area on all sheets of drawings.Correct Type of construction on sheet CS as it calls for Type II-B and Type III-B. New floor area must match exiting Type of construction for existing building including floor area justification and exterior column and wall fire resistive construction due to distance to property lines to be based on Type III-B.Provide pedestrian protection in accordance with CBC Section 3306. Show location and type of protection on plan view. Provide typical construction details, sections, and elevations of pedestrian protection required. Pedestrian protection constructed within a public right of way shall require a building permit issued by the Building Safety Division and a separate approval from the City’s Public Works Agency (714) 647-5039.Provide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables 601, 602, and 704.8. Indicate distance from exterior walls of addition and exiting building to all property lines. All Property lines must be identified on the site plan.Show on the plans: - Complete legal description - Assessor’s Parcel Number - Project Address/Suite/Room Numbers; Building Numbers - Occupancy Classification(s) Identify occupancy of existing and new occupancy of each area on the floor plan. - Showoccupancy separation between existing and new occupancies when required by Table 508.4 of CBC. - Type of Construction (all exterior walls to be non-combustible) - Area tabulation justifying floor area(s) of building(s) (CBC Sections 503, 505, 506, 507, and 508 and CBC Table 503) including existing mezzanine and new addition. - Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section 506.3, required by CBC Section 903 for type of occupancy, etc.) - Number, width, and purpose (cite code section) of yards required - Number and fire-resistive rating of all area separation walls - Number of stories/mezzanines and building height in feetNote that Fire Sprinkler System to be installed under separate permit for new addition on the drawings.Note on the floor plan the use and occupancy load of each room and/or area. Relate each use to a CBC Table item. Note occupant loads which are the greater number based on CBC Section 1004 and Table 1004.1.1 or the actual number of occupants.Specify finish floor elevation of existing building and new addition and provide transition detail. Provide detail to insure compliance for all exterior exit doors for proposed addition. All doors require a level floor landing on each side in accordance with CBC Sections 1008.1.4, 1008.1.5, 1008.1.6, and 1133B.2.4 and CBC Figures 11B-26A and 11B-26B. Provide typical door threshold details and details of change in floor covering material.The City of Santa Ana requires concrete exterior door landings. Revise the drawings to show compliance for each exit door.Provide on the drawings a complete door schedule, showing: - Door sizes (CBC Sections 1008.1.1 and 1133B.2) - Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and 1133B.2.5) - Compliance with limitation of viewport size (CBC Section 715.4.3 Exception 1) - Fire-rating of door assembly complying with CBC Section 715 Opening Protection - Note smoke seal (in accordance with CBC Section 715.4.3, required for doors forming part of the one-hour exit corridor envelope) - Show compliance with the City of Santa Ana’s Security Ordinance (Contact the Santa Ana Police Department Crime Prevention Section by telephoning 714-647-5840)CBC Section 1008.1.2, Exit doors shall swing in the direction of exit travel when serving any hazardous area or when serving an occupant load of 50 or more.Panic hardware shall comply with CBC Section 1008.1.9. Panic hardware shall be provided as required by CBC Section(s): - H Occupancy - Electrical rooms with equipment rated 1,200 amperes or more and over 6’ wide that contain over current devices, switching devices or control devices with exit access doors shall be equipped with panic hardware and doors shall swing in the direction of egress.- By the (OCFA) Fire Department Occupancies storing, handling, using, and/or selling hazardous materials, liquids, and chemicals shall submit a list of all said materials, listing their quantities and how they relate to specific California Building Code Table items. Note on the Floor Plan, type and quantity of hazardous material in each control area and fire-resistive rating for fire barriers.Occupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning, or Fire Departments.When there has been a change in use or occupancy classifications, drawings shall show compliance with the CBC requirements for the new classifications. Reference CBC Section 3406.Submit a letter addressed to the Building Safety Division describing in detail the manufacturing process from material delivery, storage, handling, packaging, and shipping of finish product. Include an equipment list describing use in the process.Table 1015.1 Spaces With One Means of Egress: (Show calculations on the drawings) OccupancyMaximum Occupant Load A, B, F,49 H-1, H-2, H-33 H-4, H-5,10 S29When occupancy separation wall is require, Plans shall indicate how required structural and fire resistive integrity will be maintained where a penetration will be made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems. CBC Section 106.1.1 and CBC Chapter 7. Note on the plans the ICC Research Report number, U.L. number, State Fire Marshal number, or approval number of another agency accepted by the City of Santa AnaRefer to the attached entrance/door handout. Revise the drawings to show compliance. It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. City of Santa Ana does not have jurisdiction to enforce ADA compliance and it is the responsibility of designer. If applicable please remove notes referring to ADA compliance from drawings. This project is reviewed for compliance with State Accessibility Standards.Submit a signed copy of the contract showing labor and materials including architectural and structural fees for all work to be done under the subject building permit application. Valuation of proposed project is estimated to be at $100,000.00. Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B: Show both existing and new elements and how they will be upgraded to current standards.- An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsCBC Sections 1102B, 1124B.1 and 1127B.1. Show contiguous accessible path of travel from each exit door to accessible parking lotand to public way.CBC Section 1024.6, Access to a public way. The exit discharge shall provide a direct and unobstructed access to a public way.Sidewalks accommodating the disabled must be at least forty-eight inches (48”) wide and at least sixty inches (60”) where door swings over walk.At every entrance and at every major junction along or leading to an accessible route of travel, there shall be a sign displaying the international symbol of accessibility. Signs shall indicate the direction to accessible building entrances and facilities and shall comply with the requirements found in CBC Sections 1117B.5 and 1127B.3. Show location.Refer to the attached handout for Exterior Routes of Travel. Revise drawings to show compliance.CBC Section 1127B.5. Item 4. Curb ramps shall comply with CBC Section 1127B.5. A level landing 4’ deep shall be provided at the upper end of each curb ramp over its full width to permit safe egress from the ramp surface, or the slope of the fanned or flared sides of the curb ramp shall not exceed 1 unit vertical to 12 units horizontal (8.33% slope).Provide truncated dome at zero curb between building entrance exit doors. Identify location of new existing curbs and provide detail/s to insure compliance. Provide site plan showing location of accessible parking stalls and provide truncate domes to cove the accessible parking stall landing. If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5. Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Plumbing facilities shall be provided in accordance with the California Plumbing Code (CPC) Section 412.0 and CPC Table 4-1. Show occupant load calculation to show compliance with Table A of CPC. Show location, number, accessible toilet rooms and accessible path of travel from new area to existing toilet rooms.Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings:- Provide mechanical ventilation for each area/room in accordance with the 2010 California Mechanical Code.Note on drawings:Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.Provide parking space identification in accordance with CBC Section 1129B.4 including: - Each parking space reserved for persons with physical disabilities shall be identified by a reflecting sign permanently posted immediately adjacent to and visible from each stall or space, consisting of a profile view of a wheelchair with occupant in white on dark blue background. The sign shall not be smaller than 70 square inches in area and, when in path of travel, shall be posted at a minimum height of 80” from the bottom of the sign to the parking space finished grade and shall be un-obscured by a parked vehicle. Signs may also be centered on the wall at the interior end of the parking space. An additional sign or additional language below the symbol of accessibility shall state “Minimum Fine $250.” Spaces complying with CBC Section 1129B.3, Item 2 shall have an additional sign stating “Van Accessible” mounted below the symbol of accessibility. - An additional sign shall also be posted in a conspicuous place at each entrance to off-street parking facilities, or immediately adjacent to and visible from each stall or space. The sign shall not be less than 17” by 22” in size with lettering not less than 1” in height, with clearly and conspicuously states the following:Unauthorized vehicles parked in designated accessible spaces not displaying distinguishing placards or license plates issued for persons with disabilities may be towed away at owner’s expense. Towed vehicles may be reclaimed by telephoning the Santa Ana Police Department at (714) 245-8665. CVC 22658a. - Provide assurance on the drawings that existing signage language reflects the paragraph above.Fixed or built-in tables to have maximum height of 34”. Provide compliance on the drawings.CBC Section 1122B. Please refer to markup set of drawings for additional plan check comments. Revise drawings to show compliance.Structural drawings to be signed and stamped by Engineer of record who prepared the structural calculations for new work.Reference page (no page number provided) for pole footing design. Revise calculations and drawings for soils bearing of 1000 psf and lateral bearing of 100 pcf, and minimum reinforcement of 2 #4 at top and 2 #4 at bottom of foundation when soils report is not available or submit two (2) copies of a geotechnical report for the subject project in accordance with CBC Section 1802. The geotechnical engineer shall include in said report applicable items noted under CBC Section 1803.6 below.CBC Section 1803.6 Reports. The soil classification and design load-bearing capacity shall be shown on the construction document. Where required by the building official, a written report of the investigation shall be submitted that includes, but need not be limited to, the following information: - A plot showing the location of test borings and/or excavations. - A complete record of the soil samples. - A record of the soil profile. - Elevation of the water table, if encountered. - Recommendations for foundation type and design criteria, including but not limited to: bearing capacity of natural or compacted soil; provisions to mitigate the effects of expansive soils; mitigation of the effects of liquefaction, differential settlement and varying soil strength; and the effects of adjacent loads. - Expected total and differential settlement. - Pile and pier foundation information in accordance with Section 1810. - Special design and construction provisions for footings or foundations founded on expansive soils, as necessary. - Compacted fill material properties and testing in accordance with Section 1804.5.Submit structural calculations for design and justification of Storage tanks. Incorporate results of structural calculations into drawings prior to re-submittal.Attach a copy of ICC report # 1735 and 1917 on the drawings per structural drawings.