HomeMy WebLinkAbout190563_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10180172
PROJECT ADDRESS:
1590 E St Gertrude Pl Unit# B
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B, SPK
OCCUPANCY CLASSIFICATION(S):
F-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/20/2013
Roof Repair
INITIAL REVIEW
11/26/2013
EXPIRATION
5/19/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Christopher V Ward
3.
TEL:
(626)304-0011
FAX:
(626)304-0074
VALUATION:$5,000.00
EMAIL:
Chris@cwaarchitects.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSResubmit 3corrected sets of plans.Please return marked up set of drawings with corrections.(when needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceValuation of proposed project is calculated as $ 10,000.00. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Section 1134B. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B: (Refer to above comment)
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsIndicate R value for roof insulation where repair to be made in compliance with T-24 energy standards.