Loading...
HomeMy WebLinkAbout187445_3_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: PROJECT ADDRESS: PLAN CHECK ENGINEER:TEL:714FAX:714 647-5897 TYPE OF CONSTRUCTION: OCCUPANCY CLASSIFICATION(S): PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION INITIAL REVIEW EXPIRATION RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. 3. TEL: FAX: VALUATION: EMAIL: FLOOD ZONE: Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) for an appointment. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840). -Public Works Agency approval (647-5039). -Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. - School District Compliance Certificate; and a copy of the building permit application, signed by the plan check engineer, shall be required by the School District to verify the scope of the work. Provide a fully dimensioned Site Plan on the drawings and on a separate 8-1/2" x 11" sheet of paper. Provide and show on the plans, house street number visible and legible from street. (Minimum 4”High x 1” Wide) CRC R319All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315) - Carbon monoxide alarms shall only be required in the specific dwelling unit or sleeping unit for which the permit was obtained. Carbon monoxide alarms required by Sections R315.1 and R315.2 shall be installed in for this addition. - Outside of each separate dwelling unit sleeping area in the immediate vicinity of the bedroom(s). - On every level of a dwelling unit including basements. - Where more than one carbon monoxide alarm is required to be installed within the dwelling unit or within a sleeping unit the alarm shall be interconnected in a manner that activation of one alarm shall activate all of the alarms in the individual unit. Exception: Interconnection is not required in existing dwelling units where repairs do not result in the removal of wall and ceiling finishes, there is no access by means of attic, basement or crawl space, and no previous method for interconnection existed.Provide details of the deck/balcony and specify method of waterproofing. List ICC approval number for decking material. Show two percent minimum slope. (CRC R905.10.1)Shower compartments and walls above bathtubs with shower heads installed shall be finished with a smooth, nonabsorbent surface to a height of not less than 72” above the floor. (CRC R307.2)Interior spaces intended for human occupancy shall be provided with heating facilities capable of maintaining a room temperature of 68 degrees Fahrenheit at a point 3 feet above the floor and 2 feet from exterior walls in all habitable rooms. (CRC R303.8)Provide a complete full-height section and details of stairway showing: (CRC R311.7) - Maximum rise of 7¾ inches and minimum run (tread) of 10 inches. - Minimum width of 36 inches. - Minimum headroom of 6 feet 8 inches. - Framing (stringer, landing, etc.) size, bracing, connections, footings. - Stairways positively anchored to the primary structure without using toe nails or nails subject to withdrawal. - Enclosed usable space under a stairway requires ½ inch gypsum board on the enclosed side. (CRC R302.7)Handrails shall not project more than 4.5” on either side of the stairway and the minimum clear width of the stairway at and below the handrail height shall be 31.5” and 27” when installed on one side and both sides, respectively. (CRC R311.7.1) Provide a stairway cross-section showing minimum clear headroom of 6'-8". (CRC R311.3.2) Provide detail of the guard showing that a 4” diameter sphere may not pass through any opening in the guard. (CRC R312.3)Provide cross ventilation for attic and each enclosed rafter space as specified in CRC Section R806. Callout attic vent locations, sizes and types on plans. Provide attic ventilation calculation to show minimum ventilation is provided. (CRC R806.2)Specify a minimum 0.019” (No. 26 galvanized sheet gage) corrosion-resistant or plastic weep screed located below foundation plate line and 4 inches above grade on all exterior stud walls or 2-inches above paved areas. (CRC R703.6.2.1) Provide a weep screed for stucco at the foundation plate line a minimum of 4 inches above the earth or 2 inches above paved areas. (2512.1.2) Show location of underfloor access crawl hole (18 x 24 inches). (CRC R408.4)Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered Civil Engineer for: - Stairway(s). - Handrail(s)/Guard(s). - Guard(s). The City has encountered a large number of inspection problems arising from a lack of specific framing details. The following listed items are required to be shown on the plans (CBC 107.1): - All plumbing walls are to be framed with a minimum of 6" studs. -Notching of exterior and bearing/nonbearing walls shall not exceed 25%/40% respectively. Bored holes in bearing/nonbearing walls shall not exceed 40%/60% respectively. In no case shall the edge of the bored hole be nearer than 5/8 inch to the edge of the stud. (2308.9.10 and 2308.9.11)All wood framing members that rest on concrete or masonry exterior foundation walls and are less than 8” to the exposed ground shall be pressure treated or naturally durable to decay. (CRC R317.1 (2)) Provide 3 x 3 x .229" plate washers. CRC R602.11.1 The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans. - Signed Energy Efficiency Documents must be printed on the plans. - Also, submit 2 copies of signed Energy Efficiency calculations. - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2008 California Energy Code). The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. -The energy plan check consultant must sign documentation forms on behalf of the Building Safety Division. - Refer to the attached public handouts titled “Energy Efficiency Compliance” and “Energy Efficiency Compliance Documentation”. Provide continuous operating exhaust fan in the bathroom with required ventilation rate per Section 150-o, Table 4-7 of 2008 Residential Compliance Manual. Ventilation air must come directly from the outdoors and not from attic or crawl spaces. See redmarks on the following sheets of plan: A-1, A-2, A-3, A-4, S-2.0, S2.1, S2.2, S3.0, & S5.0. Also, please see the redmaks on the following pages of calc.: page 14, 1st and 2ndFlr Lateral analysis, Typical Strap Holdown, & shear wall calculation- level 1.