Loading...
HomeMy WebLinkAbout189452_3_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10379820 PROJECT ADDRESS: 3430 W Maywood Ave PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 10/8/2013 INITIAL REVIEW 10/15/2013 EXPIRATION 4/6/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Martin Harvey 3. TEL: (714)292-0987 FAX: VALUATION:$1,000.00 EMAIL: mharvey@me.com FLOOD ZONE:X-0602320258J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 2 corrected sets of plans. Please return marked up set of drawings with corrections.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please contact Mr. KraigKiker at 714-647-5869 for equipment located inside of building. at this review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceIncorporate results of calculations into drawings and engineer to sign and stamp structural drawings. Drawings submitted to the Building Division for review shall provide the following information(drawing and applicable details) by providing complete drawings and details to insure compliance with CBC Section 1134B/Chapter 11B: - An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarmsValuation of proposed project is calculated as $ 1000.00 a minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Section 1134B. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.Please complete attached hardship from to identify items list in comment number 8 is to be upgrade and items that are not upgraded as part of this permit.