HomeMy WebLinkAbout188442_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10179517 PROJECT ADDRESS: 1343 E Wilshire Ave PLAN CHECK ENGINEER: Kwak, JasonTEL:714 647-5866FAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): B, F-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/21/2013 INITIAL REVIEW 10/28/2013 EXPIRATION 2/17/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Ryan Oldham 3. TEL: (714)482-8296 FAX: VALUATION:$100,000.00 EMAIL: Ryan@oldham-architects.com FLOOD ZONE:X-0602320276J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5866 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2010 California Building Standards Code with local amendments.Provide complete roof plan and roof drainage and slope informationProvide foundation planProvide complete structural detailingCBC Sections A107, All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow on the plans: - Occupancy Classification(s) - Type of Construction - Area tabulation justifying floor area(s) of building(s) (CBC Sections 503, 505, 506, 507, and 508 and CBC Table 503) - Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section 506.3, required by CBC Section 903 for type of occupancy, etc.)The building is classified as Type III-B however the new exterior wall extension is combustible material. Revise wall construction to be match Type III or revised to Type V and provide area and height justification.Provide dimensioned floorplan.Clarify existing raised roof area adjacent to new scope of work.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Provide parking data on the site plan showing the total number of parking spaces provided, the number of disabled accessible spaces and the number of van accessible spaces, showing compliance with CBC Section 1129B and CBC Table 11B-6.Provide foundation plan. Provide analysis for new columns locations at existing foundations.Provide complete details including shear transfer, column to beam connections, drag ties, etc.Provide out of plane wall analysis and load transfer detailing.See red markups on plans. Additional corrections may apply once complete plans are submitted.