HomeMy WebLinkAbout190884_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10180280
PROJECT ADDRESS:
2321 S Pullman St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/11/2013
INITIAL REVIEW
12/19/2013
EXPIRATION
6/9/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Triet Ngo
3.
TEL:
(562)401-5551
FAX:
VALUATION:$40,000.00
EMAIL:
Triet.ngo@verizon.net
FLOOD ZONE:X-0602320279J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.(When meeting is needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department (OCFA) approval on the corrected/final sets of drawings (647-5839 or 647-5700)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance
Identify all building/structures around proposed LN2 tank and show distance from each structure to new tank.Occupancies using hazardous materials are subject to special requirements. It is the applicant’s/owner’s responsibility, PRIOR TO SUBMITTAL, to make this known to the Building, Planning and (OCFA) Fire Departments.
Reference page 5 of structural calculations, In lieu of soils investigation report per Sections 1803.6 of the 2010 California Building Code and City of Santa Ana internal policy, revise structural calculations for minimum foundation/footing design as follows:
- Allowable foundation pressure not to exceed 1000 PSF.Incorporate results of revised structural calculations into drawings prior to re-submittal.Submit structural calculations to justify that the weight of concede foundation is sufficient for lateral stability. Please callout all structural items that require special inspection and verify material specification on the structural drawings to reflect findings of calculations.