HomeMy WebLinkAbout189646_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10179887
PROJECT ADDRESS:
1007 E Chestnut Ave Unit# -
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/15/2013
New exterior canopy
INITIAL REVIEW
10/18/2013
EXPIRATION
4/13/2014
RECHECKS:
1.12-26-13
PROJECT APPLICANT CONTACT PERSON:
2.
Rob Trout
3.
TEL:
(949)295-8609
FAX:
VALUATION:$6,000.00
EMAIL:
rtrout2010@gmail.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSCBC Sections A106.1 and A106.3.4.1, All architectural drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.Architectural drawings to be signed by designer.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- School District Compliance Certificate; a copy of the building permit application, signed by the plan check
engineer, shall be required by the School District to verify the scope of work. Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance
BUILDING PLANNING Provide the following: (Reference sheet S-P, All accessibility items must show compliance as part of this permit) Complete site plan is required.
- Show all property lines of record on the site plan. Show compliance with CBC Section 704 and CBC Tables
601, 602, and 705.11 for new canopy.In-lieu of providing compliance with above Sections (distance from property lines to canopy. A minimum of 5’.0” set back is required for combustible canopy) show non-combustible canopy for the first 5’.0” measured from property lines OR steelstuds (non-combustible construction) for the entire canopy. Please revise structural drawings when architectural drawings are revised.If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5.
Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Please refer to red mark drawingfor location of truncated domes. Show truncated tomes on the drawings.
SANITARY FACILITIESCBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load.Detail not provided.
ENERGY STANDARDS
This building is subject to the State of California Energy Conservation Regulations (New store front glazing and exterior wall modification) :
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is
qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations
(CCR,) Title 24, Par 6, 2008 California Energy Code. Submit two copies and provide a copy of required forms on the drawings.
- The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance
documentation with completed signature blocks filed on the plans.