PLAN CHECK NO:
10180542
PROJECT ADDRESS:
815 S Sycamore St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3, U
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
1/23/2014
INITIAL REVIEW
3/31/2014
EXPIRATION
7/22/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Ricky Hernandez
3.
TEL:
(909)559-1116
FAX:
VALUATION: $48,000.00
EMAIL:
riteck@sbcglobal.net
FLOOD ZONE: X-0602320276J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please refer to red marked drawings for plan check comments. Revise drawings to show compliance. Resubmit 3corrected sets of plans. Drawings are available to be picked up at permit counter and appointment is not needed.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.CBC Sections A106.1 and A106.3.4.1, All drawings and supporting documents shall be stamped and signed by a California licensed architect or registered civil engineer.Include address and telephone number of the responsible designer, and date of signing of drawings.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance