HomeMy WebLinkAbout190025_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10180006
PROJECT ADDRESS:
1108 N Baker St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/4/2013
INITIAL REVIEW
1/10/2014
EXPIRATION
5/3/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Thomas Moss
3.
TEL:
(714)305-3026
FAX:
VALUATION: $123,530.00
EMAIL:
tommoss@statewidehomes.net
FLOOD ZONE: X-0602320144J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.
Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees.
The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
-Police Department approval on the corrected/final set of drawings (647-5840).
-Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work.
New one- and two-family dwellings and townhouses shall have an automatic fire sprinkler system installed in accordance with CRC Section R313.3 or NFPA 13D. Contact the Santa Ana Fire Department for fire sprinkler permit requirements (714) 647-5839. (CRC R313)Provide building information on plans:
- Occupancy type: R3 / U
- Construction type: Type V – B
- Fire sprinklered: Yes / NoExterior wall penetrations less than 5’ in dwelling units and accessory buildings without an automatic residential fire sprinkler protection, or less than 3’ in dwelling units and accessory buildings with an automatic residential fire sprinkler protection shall comply with CRC Section R302.4.Provide documentation to indicate the project meets the requirements of State mandatory energy efficiency standards. CGBC 4201.1Illustrate that potable water use is reduced by at least 20 percent. CGBC 4303.1 Indicate the method of compliance, either prescriptive or performance. Note: Residential reduction not required until July 1, 2010.Provide "Baseline Water Use" document (WS-l)Provide 20% Reduction Water Use document (WS-2)Both WS-l and WS-2 shall be submitted as part of the plan check approval process.Indicate on plans method of showing field verification either by installer or third party.Plumbing fixtures and fittings shall meet the standards referenced in CGBC Table 4.303.3. CGBC 4303.3Provide complete elevation from the grade to the top of the building with the dimensions. Show height of the porch.Show height of the footing panel.Is there any stairway at the porch? If there is , please provide construction detail for -Stairway-Handrail-Guards