Loading...
HomeMy WebLinkAbout192332_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10180721 PROJECT ADDRESS: 1500 S Auto Mall Dr PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B, S-1, S-2 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 2/24/2014 INITIAL REVIEW 3/12/2014 EXPIRATION 8/23/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Richard Rice 3. TEL: (626)335-2887 FAX: (626)335-1197 VALUATION:$10.00 EMAIL: Rick@rrsigns.com FLOOD ZONE:X-0602320277J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore. This requirement applies to both exempt and non-exempt projects. Business and Professions Code Chapter 3, Division 3, Section 5536.1(a).Plans need to be in compliance with CBC 2013.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceProvide the wind load on the calculation.Provide an attachment detail for the sign to the plate on detail 3.Verify attachment of the existing steel tube to the structure will be able to take additional load transferred from the sign to the tube from the wind load.Please submit a signed copy of the contract showing labor and materials for all the work to be done under the subject building permit application.