PLAN CHECK NO:
10180219
PROJECT ADDRESS:
2243 E Santa Clara Ave
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/2/2013
INITIAL REVIEW
2/11/2014
EXPIRATION
5/31/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Enrique Wallace III
3.
TEL:
(949)246-3683
FAX:
VALUATION:$64,654.22
EMAIL:
wallacedesigngroup@cox.net
FLOOD ZONE:X-0602320164J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2010 California Building Code (CBC); CMC = 2010 California Mechanical Code; CPC = 2010 California Plumbing Code; CEC = 2010 California Electrical Code; T = Table; ICC = International Code Council.
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. (when needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please refer to red marks on the drawings for additional plan check comments. Revise drawings to show compliance. Return marked up set of drawings with corrections.Resubmit 3corrected sets of plans.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following, prior to building permit issuance:
-Planning Division approval on the corrected/final set of drawings (647-5804). Previously
approved plans should be submitted to expedite the process.
- Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
- Police Department approval on the corrected/final set of drawings (647-5840).
- Public Works Agency approval (647-5039).
- Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
- School District Compliance Certificate; and a copy of the building permit application, signed by
the plan check engineer, shall be required by the School District to verify the scope of the work. (New floor area of 243 SF)Show the complete legal description and assessor's parcel number on the plans.
Provide pedestrian protection in accordance with CBC Section 3306. Show location and type of protection on plan view. Provide typical construction details, sections, and elevations of pedestrian protection required. Pedestrian protection constructed within a public right of way shall require a building permit issued by the Building Safety Division and a separate approval from the City's Public Works Agency (647-5039).Floor area justification of existing and addition based on Table 503 is required. Compliance for fire rating of exterior walls and openings based on Table 602 id required. Show all property lines of record on Site Plan. Show location of interior property lines and distance to existing and new structure. Show fire rating of exterior walls, openings and required parapet and fire rating.Indicate and dimension all "assumed" property lines between R and B occupancy buildings.Provide eave / overhang / projection setback to all property lines.All doors require a level floor landing on each side in accordance with CBC Sections 1008.1.4, 1008.1.5, 1008.1.6, and 1133B.2.4 and CBC Figures 11B-26A and 11B-26B. Provide typical door threshold Note on the floor plan the use and occupant load of each room and/or area based on CBC Section 1004 and Table 1004.1.1.Refer to Table 1015.1 for spaces with one means of egress based on maximum occupant load. Provide natural ventilation per Section 1203.4 and natural or artificial lighting per section 1205 of CBC. In lieu of natural ventilation provide mechanical ventilation per California Mechanical code.Tactile exit signs shall be required at the following locations:
- Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.”
- Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual
exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.”For the purpose of Section 1011.3, the term “tactile exit signs” shall mean those required signs that comply with Section 1117B.5.1, Item 1.(When applicable) If a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 1133B.8.5.
Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 1133B.8.5.Indicate the top of fixed or built-in counter, tables is between height of to be at 28” to 34” above the finish floor and knee clearance to be a minimum of 27” high, 30” wide, and 19” deep. CBC Sections 1122B of CBC. Show clear floor under the sink area.Please refer to accessibility handouts and show compliance on the drawings. CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.CBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load.CBC Section 1115B.4.3 Item 4. Note on the drawings hot water and drain pipes under lavatory shall be insulated.
Submit structural calculations for design and justification when new exterior wall of proposed exercise room is next to a exiting pool. Indicate depth of pool at low and high end on the drawings.
Correct shear wall ratio of Width to height for red mark area on the drawings and provide justification of removal of shear wall along the same wall.
In lieu of soils investigation report per Sections 1803.6 of the 2010 California Building Code, revise structural calculations for minimum foundation/footing design requirements for small projects as follows:
-Allowable foundation pressure not to exceed 1000 PSF.
- Footing to have minimum reinforcement of: 2 #4 at top and 2 #4 at bottom.
The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans.
- Signed Energy Efficiency Documents must be printed on the plans.
- Also, submit 2 copies of signed Energy Efficiency calculations.
- The corrected/final drawings shall have the required energy efficiency compliance documentation
with completed signature blocks filed on the plans.
-The energy plan check consultant must sign documentation forms on behalf of the Building
Safety Division. Show cool roof when require by T-24 energy calculations.The constructions documents shall provide sufficient clarify to indicate the location, nature, and scope of the proposed green building features. CGBC 102.2Plans shall indicate method of verification of compliance with all CALGreen requirements. Third party or other methods shall demonstrate satisfactory conformance with mandatory measures. Include City's Mandatory Measures Checklist copies onto plans.See attached CalGreen handouts, complete each handout and provide a copy on the drawings.