PLAN CHECK NO:
10180261& 263
PROJECT ADDRESS:
200 N Harbor Blvd
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
A-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/9/2013
INITIAL REVIEW
12/15/2013
EXPIRATION
6/7/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Steven R. Bradley
3.
TEL:
(619)295-4102
FAX:
(619)295-4428
VALUATION:$120,000.00
EMAIL:
steve@srbradley.com
FLOOD ZONE:X-0602320256J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application:
- Revise project job description on the building permit application worksheet to reflect the work to be done
under the subject building permit application.
- Construction drawings must clearly show all work to be done under the subject building permit application.
- Delete all notes and details from drawings that are not a part of the work to be done under the subject building
permit application. This includes mechanical, plumbing and electrical work that is not specifically required by
the Building Code.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Provide ICC report for new metal roof.If there is an accessible ramp, show the slope of the ramp, size of the top and bottom landing per key note S1.On floor plan please show slope for path of travel, including the curb ramp (Sheet A1.0)Please make a note awnings are not part of the this permit.It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Section 1134B/Chapter 11B:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsAt every entrance and at every major junction along or leading to an accessible route of travel, there shall be a sign displaying the international symbol of accessibility. Signs shall indicate the direction to accessible building entrances and facilities and shall comply with the requirements found in CBC Sections 1117B.5 and 1127B.3.Walks and sidewalks shall not have cross slopes exceeding ¼” per foot (2% slope). Slopes along the path of travel shall not exceed 5% unless designed as a pedestrian ramp in accordance with CBC Section1133B.5. For curb ramps refer to CBC Section 1127B.5.Complete the attached Disabled Accessibility Documentation Form.This building is subject to the State of California Energy Conservation Regulations:
- The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is
qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations
(CCR,) Title 24, Par 6, 2010 California Energy Code. The plan check consultant must sign documentation
certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency.
- The corrected/final ARCHITECTURAL drawings shall have the required energy efficiency compliance
documentation with completed signature blocks filed on the plans. The same information may be copied on
the Electrical Plans for the Electrical Plan Checker.
- Provide cool roofing as required by 2008 Energy Standards.
- The energy plan check consultant must complete the attached “Energy Conservation Plan Check Consultant
Qualification Statement.”Please provide wall legends on sheet S4 to show existing and new walls.Show location of all existing roof drains.Provide structural design basis on the drawinsg.Show location of the posts on the plans.Show support for the new beams.Provide detail to show support for the corner connections of beam 6x 12 on the north side. On the west and north elevation please show which part of the walls are being removed.Please provide section detail per red marks on sheet A3.Per demo plan all the windows are removed, detail 3/SD2 shows existing walls (studs), please clarify.On detail 3/SD2 , show how the hinges will be prevented.Show size of the front entry beam.Show ceiling joists and roof rafters at the new entry.Show how the front beam is supported. Provide drag with the detail for the west elevation.Provide detail to show how the new ceiling joists are being supported at the existing beam. Provide engineering detail to show how new roof rafters are being supported per detail 3/A4.1.Please justify that existing roof trusses takes concentrated load from the new roof per detail 3/A4.1.Show detail for increasing the wall height on north elevation.Structural plan on sheet S4 for new soffit doesn’t match ceiling plan on sheet A1.1, please clarify.Provide out of plane support for wall height increase on North side.Engineer to make statement, increase profile of the building would not increase the lateral load by 10% per chapter 34 CBC 2010.Structural detailing is in-complete and does not match architectural plan, please provide completed plans for full review