HomeMy WebLinkAbout191043_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10180335
PROJECT ADDRESS:
1435 W First St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, M
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
12/18/2013
Roof Mount. Solar
INITIAL REVIEW
3/18/2014
EXPIRATION
6/16/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Dustin Simonton
3.
TEL:
(760)242-7652
FAX:
VALUATION:$26,500.00
EMAIL:
dustin@socal-solar-energy.com
FLOOD ZONE:X-0602320257J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made.Resubmit 2corrected sets of plans. Architectural and structural drawings to be signed by licensed architect/engineer.(when needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for informationThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance
Indicate size of pilot holes on the drawings where solar panels are to be attached with 5/16” DIA lag bolts to existing roof members. Revise drawings.
Submit structural calculations for vertical loads analysis by California Licensed engineer or architect for design and justification of existing roof members when subject to additional load from solar panels. Provide dimensioned roof framing plan. Call out size and spacing of each member. Show location of existing equipment and weight on the roof and include the weight of each piece of equipment in the calculation.
Incorporated results of calculations into drawings prior to re-submittal. CBC Sections A106.1 and A106.3.4.1, All drawings(Architectural and structural) and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.
Indicate slop of roof and location of roof drain and insure that solar panels are not blocking the existing drainage pattern of existing roof.