HomeMy WebLinkAbout192625_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10180804 PROJECT ADDRESS: 4815 3/4 W Camille St Unit# WCC02 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: N/A OCCUPANCY CLASSIFICATION(S): N/A PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 3/6/2014 INITIAL REVIEW 3/21/2014 EXPIRATION 9/2/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Allen Rolison 3. TEL: (949)398-8050 FAX: VALUATION:$22,000.00 EMAIL: arolison@sbasite.com FLOOD ZONE:A-0602320256J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Please return marked up set of drawings with corrections.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance Provide calculations for design and justification of existing pole, attachment and foundation system. Provide as built/existing drawings. Section 3404.4 of CBC where the alteration increases design lateral load.   Any existing lateral load carry structural elements whose demand-capacity ratio with the alteration considered is no more than 10 percent grater its demand-capacity ratio with the alteration ignored shall be permitted to remain unaltered. CBC Section 1603.1.4, Wind design data. The following information related to wind loads shall be shown, regardless of whether wind loads govern the design of the lateral-force-resisting system of the building: - Basic wind speed (3-second gust), miles per hour (km/hr). - Wind importance factor, I, and occupancy category. - Wind exposure. Where more than one wind exposure is utilized, the wind exposure and applicable wind direction shall be indicated. - The applicable internal pressure coefficient. - Components and cladding. The design wind pressures in terms of psf to be used for the design of exterior component and cladding materials not specifically designed by the registered design professional.CBC Section 1603.1.5, Earthquake design data. The following information related to seismic loads shall be shown, regardless of whether seismic loads govern the design of the lateral-force-resisting system of the building: - Seismic importance factor, I, and occupancy category. - Mapped spectral response accelerations, SS and S1. - Site class. - Spectral response coefficients, SDS and SD1. - Seismic design category. - Basic seismic-force-resisting system(s). - Design base shear. - Seismic response coefficient(s), CS. - Response modification factor(s), R. - Analysis procedure used. This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A or AE. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, or at (or above) the base flood elevation specified for the AE zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation." Note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a final certificate must be submitted at the time of final inspection."Walls and concrete foundation stem walls of attached garages are required to comply with FEMA requirements and shall be at (or above) the base flood elevation.Specify finish floor elevation of first floor. (CBC 107.2.5)