HomeMy WebLinkAbout191999_2_Corrections.docxRESIDENTIAL PLAN CHECK
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10180609
PROJECT ADDRESS:
2760 W Segerstrom Ave Unit# A
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
U, R-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
2/5/2014
INITIAL REVIEW
4/3/2014
EXPIRATION
8/4/2014
RECHECKS:
1.5-19-14
PROJECT APPLICANT CONTACT PERSON:
2.
Nelson Olvera
3.
TEL:
(714)771-2103
FAX:
VALUATION: $10,000.00
EMAIL:
nolvera@dmcontructuionservices.com
FLOOD ZONE: X-0602320259J
Recheck Date; 5-19-14
Please call plan check engineer at 714-647-5831for appointment at permit counter to review project.
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit 3corrected sets of plans.Resubmit marked original, calculations and this correction sheet. (When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance.All new construction, interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000, or when one or more sleeping rooms are added or created, the entire dwelling shall be provided with smoke detectors located as required for a new dwelling. Show locations on the drawings.All new construction, Interior or exterior alterations, repairs, or additions requiring a permit and having a valuation in excess of $1,000,, an approved carbon monoxide alarm shall be installed in dwelling units and in sleeping units within which fuel-burning appliances are installed and in dwelling units that have attached garages shall be provided with carbon monoxide alarms (CRC R315)Garages beneath habitable rooms shall be separated from all habitable rooms above by not less than a 5/8-in type X gypsum board. (CRC R302.6). Private garage shall be separated from the residence and its attic by a minimum 5/8-in type X gypsum board applied to the garage side. Provide a 42 inch high guardrail at balconies, landings and decks located more than 30” vertically to the floor or grade below. (CRC R312.1, R312.2 & CRC R312.3). Provide detail of the guard showing that a 4” diameter sphere may not pass through any opening in the guard. ( 3-7/8” maximum of spacing is required)Provide minimum 2% slope at flat roof and deck.Correct occupancy to R-2 on the drawings.Fireblocking is required in concealed spaces 10’ o.c. horizontal, vertically at the ceiling and floor levels, connections between horizontal and vertical spaces, concealed spaces between stair and landing, openings around vents, pipes, ducts, cables, wires, chimneys and fireplaces. (CRC R302.11)
On the drawings, provide Nailing Schedule in conformance with CRC Table R602.3(1).Revise drawings to show compliance with 2012 IBC, 2013 CBC and ASCE 7-10. Soil bearing pressure is limited to 1000 lbs/sq ft unless a soils report is provided R401.4.1.Specify special inspection for Epoxy connection.Engineer of records to add a statement on the drawings to clarify the reason/s as why such a structural modification is required.