Loading...
HomeMy WebLinkAbout191759_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10180543-45 PROJECT ADDRESS: 2800 N Main St Unit# 412 PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 1/23/2014 INITIAL REVIEW 2/15/2014 EXPIRATION 7/22/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Connie Carter 3. TEL: (714)624-0940 FAX: (714)649-2024 VALUATION:$20,000.00 EMAIL: conniejcarter@yahoo.com FLOOD ZONE:X-0602320163J APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Provide on the drawings a complete door schedule, showing: - Door sizes (CBC Sections 1008.1.1 and 1133B.2) - Hardware complying with exiting and disabled accessibility requirements (CBC Sections 1008.1.8 and 1133B.2.5)Exit illumination and exit sign requirements in accordance with CBC Section 1011 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.CBC Section 1011.1. Provide a directional exit sign at changes in exiting direction.CBC Section 1607.7. Provide complete grab bar details on the drawings showing compliance with CBC Section 1115B.8 including structural strength to support a 250 pound point load.Tenant improvements in the MainPlace Mall shall show compliance with the following special provisions and CBC Section 402: - Note on drawings: Duct and smoke removal system modification is not allowed and shall be in compliance with the “Code Analysis and Fire Protection and Life Safety Concept.” - CBC Sections 402.7.2 and 708. Each tenant space shall be separated from other tenant spaces by a wall having a fire-resistive rating of not less than one hour. The separation wall shall extend from the floor to the underside of the ceiling above. - CBC Section 402.4.2, Number of means of egress. When the distance of travel to the mall exceeds 75’ within the public area of a tenant space or when the occupant load served by the exit to the mall exceeds 49, not less than two means of egress shall be provided. The occupant load of a public sale area shall be computed at 30 square feet per occupant. Occupant loads for other areas shall be computed in accordance with Table Number 1004.1.1. (Provide secondary exit for unit 416, and show it on sheet A1)Please clarify if any alteration is made to the ceiling.Please identify area of the work on sheet A1.Scale on sheet A2 shows 1/8 , please change the dimensions respectively.Show the location of the barricade on sheet A1, and show the distance from the barricade to the opening.Provide span table for ICC1338 metal studs.Show 60” clear radius floor in the toilet.Detail 16/A3.1 not found , please provide complete framing detail for the bathroom ceiling.On detail 19/A3 ,for 1 hr fire rated wall , please show no gap.Detail 16/A3, show 1-hr fire rated wall, since it is required 1-hr fire rated between storage and the store.Please identify the use of the unit with the fitting rooms.There is no closure or store front at the front of the store, please clarify.Storage door cannot open into the exit passageway.New demising wall is passing beyond the lease line, is there an addition to the store? Please change the exit corridors to exit passageway, since they are considered as exit passageway.Provide exit signs for all the units.