Loading...
HomeMy WebLinkAbout195715_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10181786 PROJECT ADDRESS: 1026 W Camden Pl PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/27/2014 INITIAL REVIEW 7/23/2014 EXPIRATION 12/24/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Al Maciel 3. TEL: (714)285-1121 FAX: VALUATION: $34,226.00 EMAIL: aadrafting@msn.com FLOOD ZONE: X-0602320257J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2010 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment. Please see corrections on submitted plans. Red marked set must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plancheck fees. All drawings and supporting documents shall be prepared, stamped, and signed by a California licensed architect or registered professional engineer. This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: -Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. -Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. Show location of minimum 20x30-inch attic access with 30-inch minimum headroom for the existing house plus one for the proposed addition; or provide access from the existing attic area to the new attic area.Show the location(s) of hard-wired smoke detector(s) with a battery back up in each sleeping room and at a point centrally located in the corridor or area giving access to each sleeping area. A detector shall be located at each story and basement, on the upper level of split level stories, and both levels if sleeping area is on lower level; a detector shall be located in close proximity to the stairway when sleeping rooms are on the upper level. (Battery-operated smoke detectors are permitted in existing construction only).Show how dwelling is provided with comfort heating facilities capable of maintaining a room temperature of 68oF at a point of 3 feet above the floor in all habitable rooms.Justify that existing wall heater is capable of maintaining this rating for the existing and the proposed addition.The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans. - Signed Energy Efficiency Documents must be printed on the plans. - Also, submit 2 copies of signed Energy Efficiency calculations. - The permit applicant shall be responsible for obtaining an energy plan check from a consultant who is qualified to perform an energy efficiency analysis in accordance with the California Code of Regulations (CCR), Title 24, Part 1 (Administration) and Part 6 (2008 California Energy Code). The plan check consultant must sign documentation certifying that a thorough, competent review has been performed on behalf of the Enforcement Agency. - The corrected/final drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. -The energy plan check consultant must sign documentation forms on behalf of the BuildingSafety Division. Show Radiant Barrier, Cool Roofing, as required by the 2013California Energy Residential Manual for proposed addition.Please justify that the proposed addition is not going to reduce (eliminate) the existing attic and under floor ventilations openings of the existing house. By removing the Eastside window from the kitchen area, due to proposed addition, please justify that existing kitchen will have adequate natural light and ventilation per code.Provide the size of the window for the bedroom #2 to insure that this window meets the escape window requirements of the code.Provide an under floor access for the proposed addition and show the existing one for the existing house. Please have the owner to complete and singe the attached “SB 407 – Installation of Water Use Efficiency Improvements Verification Form” and bring this form back for recheck of your project.