HomeMy WebLinkAbout195317_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10181667 PROJECT ADDRESS: 1251 E Dyer Rd Unit# 200 PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/17/2014 INITIAL REVIEW 6/25/2014 EXPIRATION 12/14/2014 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. John Nicolosi 3. TEL: (949)798-7323 FAX: VALUATION:$78,410.00 EMAIL: J.nicolosi@interiorarchitects.com FLOOD ZONE:X-0602320278J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Please refer to drawings for additional plan check comments.Return marked up set of drawings with corrections.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceReference sheet AN-1.0 please corrects Type of construction to Type V-B and indicate 2nd floor on the key plan.Reference sheet AN-5.0, if a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B 705.1Provide enlarge site plan to show location of existing curbs and zero curb and clearly show location of truncated dome where applicable. Detectable Warning Product Approval. Only approved Division of the State Architect, Access Compliance (DSA/AC) approved detectable warning products and directional surfaces shall be installed in accordance with CBC Section 11B-705.1.Provide additional details for all new and existing mill work for Break room, conference rooms and show accessible counters. Show accessible employee room including copy room, break room and reception area. Please note that wheel chair access (60” circle) is required. Where counter are provide, one of each type is required to be accessible. At least 5 percent, but never less than one, of each type of station shall be located at a section of counter that is at least 36” long and no more than 28 to 34” high. - Provide a minimum 30” x 48” wheelchair clear floor space. - Provide knee space at tables at least 27” high, 30” wide and 19” deep. - Provide height of tables between 28” – 34” from the floor ground. - Provide access to accessible seating space(s) by aisles with a minimum of 36” in width. Provide on the drawings interior wall and ceiling finish schedule showing compliance with CBC Section 803, 804 and CBC Table 803.5.Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place doors. Exit signs to be readily visible from any direction of approach. No point shall be more than 100’ from the nearest visible exit sign. Revise the drawings to show compliance.Means of egress from all occupied parts of the building be provided with at least 1’ candle of light at floor level. Show compliance on the drawings.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - the term “tactile exit signs” shall mean those required signs that comply with Section 11B-703 of CBC (FYI) It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. City of Santa Ana does not have jurisdiction to enforce ADA compliance and it is the responsibility of designer. If applicable please remove notes referring to ADA compliance from drawings. This project is reviewed for compliance with State Accessibility Standards (T-24). Provide parking data on the site plan showing the total number of parking spaces provided the number of disabled accessible spaces and the number of van accessible spaces, showing compliance with CBC Section 11B-501 and CBC Table 11B-208.2.Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings:- Provide mechanical ventilation for each area/room in accordance with the 2013 California MechanicalCode.Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use. Note on drawings:Artificial light. Artificial light shall be provided that is adequate to provide an average illumination of 10’candles (107 lux) over the area of the room at a height of 30”above the floor level. Provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635 and ASTM C636. In lieu of providing structural calculations, Note ICC Research Report Number on the drawings for the suspended ceiling system. (ICC Report Number 1308)Provide on the drawings a complete window schedule showing: - Window sizes - Type and thickness of glazing (type of safety glazing for hazardous locations noted under CBC Section 2406.3Glass shall be firmly supported on all four edges. Show on the drawings how compliance shall be made with CBC Section 2403.2 for glass not firmly supported on all four edges, design shall be submitted to the building official for approval.