HomeMy WebLinkAbout194879_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10181536,38,39
PROJECT ADDRESS:
2320 S Pullman St
PLAN CHECK ENGINEER:
Ahangian, KathyTEL:714
647-5812FAX:714
647-5897
TYPE OF CONSTRUCTION:
N/A
OCCUPANCY CLASSIFICATION(S):
N/A
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
6/4/2014
INITIAL REVIEW
6/10/2014
EXPIRATION
12/1/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Chris Polaski
3.
TEL:
(714)850-7575
FAX:
(714)850-7576
VALUATION:$2,500.00
EMAIL:
cpolaski@bundyfinkel.com
FLOOD ZONE:X-0602320279J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.The drawings/information submitted for Building Safety Division review is incomplete. The applicant shall, prior to resubmitting, complete all construction documents to show compliance with the 2013 California Building Standards Code with local amendments.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Fire Department approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.CBC Section 1133B.4.4, The upper approach and the lower tread of each interior stair shall be marked by a strip of clearly contrasting color at least 2” wide placed parallel to and close to (not more than 1” from) the nose of the step or landing to alert the visually impaired. The strip shall be of material that is at least as slip-resistant as the other treads of the stairs.CBC Section 1133B.4.4, Where stairways occur outside a building, the upper approach and all treads shall be marked by a strip of clearly contrasting color at least 2” wide and placed parallel to and not more than 1” from the nose of the step or landing to alert the visually impaired. The strip shall be of a material that is at least as slip-resistant as the other treads of the stair. A painted strip shall be acceptable.Provide handrail details on the drawings showing compliance with CBC Section 1009.10, 1012, and 1133B.4.1.
- Stairways shall have handrails on each side.
- Handrails shall be 34 to 38” above the nosing of treads.
- Ends of handrails shall be returned or shall terminate in newel posts of safety terminals.
- Handrails projecting from a wall shall have a space of 1½” between the wall and the handrail.For equipment pad , provide the dimension of the path and type of the equipment with specification, and anchorage detail.If trellis is existing, please remove all the details.In light pole calculation, please provide 2 lamp heads versus one lamp head.