Loading...
HomeMy WebLinkAbout197381_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10182267 PROJECT ADDRESS: 2800 N Main St Unit# 180S PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: II B, SPK OCCUPANCY CLASSIFICATION(S): M PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/19/2014 INITIAL REVIEW 8/26/2014 EXPIRATION 2/15/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Saeid Shantiyai 3. TEL: (909)860-1010 FAX: VALUATION:$27,800.00 EMAIL: sshantiyai@ladesigngroup.net FLOOD ZONE:X-0602320163J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceNote on the plan: Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 4”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings: - Provide mechanical ventilation for each area/room in accordance with the 2013 California Mechanical Code.See red marks on sheet A-202. Please call for recheck appointment. Recheck can be done over the counter.