HomeMy WebLinkAbout198244_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10182573
PROJECT ADDRESS:
521 S Broadway
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
9/18/2014
INITIAL REVIEW
12/17/2014
EXPIRATION
3/17/2015
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Jorge Nannie
3.
TEL:
(714)296-4735
FAX:
VALUATION:$5,000.00
EMAIL:
jagnni@pacbell.net
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. PAll drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineerlease call (714) 647-5862 for an appointment.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineerThe applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceIt is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11B:
- An accessible entrance
- An accessible route to the altered area
- Accessible restrooms
- Accessible telephone (if any)
- Accessible drinking fountains, and
- Parking, signage and alarmsPriority shall be given to those elements that will provide the greatest access in the above order.Valuation of proposed project is calculated as $5000. A minimum of 20% of valuation of construction is required to be spent towards providing disabled access in the priority order noted in the immediate previous item as noted in CBC Chapter 11B. Revise the drawings to show compliance. Show both existing elements and how they will be upgraded to current standards.