HomeMy WebLinkAbout190422_2_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10180136
PROJECT ADDRESS:
414 W Fourth St
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
III B
OCCUPANCY CLASSIFICATION(S):
A-2
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
11/14/2013
INITIAL REVIEW
11/25/2013
EXPIRATION
5/13/2014
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Martin Sapetto
3.
TEL:
(714)628-0563
FAX:
(714)628-0593
VALUATION:$100,000.00
EMAIL:
martin@sapettoarchitect.com
FLOOD ZONE:X-0602320276J
APPLICABLE CODE: 2010 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.Please return marked up set of drawings with corrections.Additions, alterations or repairs made to any building constructed prior to January 1, 1946, other than an R-Occupancy building, exceeds $50,000 in cost in any one-year period, then either (A) the entire building must be completely sprinklered in accordance with fire department standards, or (B) the building must comply with requirements as outlined under Santa Ana Municipal Code (SAMC) Section 8-150. A copy of SAMC Section 8-150 may be obtained by visiting the City of Santa Ana’s website at www.santa-ana.org.All drawings and supporting documents shall be prepared, stamped and signed by a California licensed architect or registered civil engineer.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- Orange County Fire Authority approval on the corrected/final sets of drawings ((714)573-6100)
- Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- County of Orange Health Department approval on the corrected/final set of drawings ((714)433-6000)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceShow on the plans:
- Project Address/Suite/Room Numbers; Building Numbers
- Occupancy Classification(s)
- Type of Construction
- Fire Sprinkler System (State purpose of sprinkler system, for example, area increase under CBC Section
506.3, required by CBC Section 903 for type of occupancy, etc.)Reference each fire-resistive assembly to a CBC Chapter 7, Table and Item number:
- Ceilings
- Columns
- Shafts
- Structural ElementsFire blocking. In combustible construction, fire blocking shall be installed to cut off concealed draft openings (both vertical and horizontal) and shall form an effective barrier between floors, between a top story and a roof or attic space. Fire blocking shall be installed in the locations specified in CBC Sections 717.2.2 through 717.2.7.Panic hardware shall comply with CBC Section 1008.1.9. Panic hardware shall be provided as required by CBC Section(s):
- An Occupancy with an occupant count > 50. Refer to CBC section 1008.1.8.3, Item 2 for Exception.CBC Sections 1115B and 1210. Sanitation facility toilet room floors shall have a smooth, hard, non-absorbent surface such as Portland cement, concrete, ceramic tile or other approved material which extends upward onto the walls at least 6”. Walls within 2’ of the front and sides of urinals and water closets shall be similarly finished to a height of 4’.Ensure sanitary facilities comply with CBC Section 1115B.8.1 and that the bottom of the mirror is no higher than 40” from the floor.All dining, banquet, and bar facilities shall be made accessible to persons with disabilities as provided in CBC Section 1104B.4 At least 5%, but not less than one of the seating spaces in each functional area is accessible as follows:
- Provide a minimum 30” x 48” wheelchair clear floor space.
- Provide knee space at tables at least 27” high, 30” wide and 19” deep.
- Provide height of tables between 28” – 34” from the floor ground.
- Provide access to accessible seating space(s) by aisles with a minimum of 36” in width.Counters where food or drink is served shall show compliance with the following:
- Top of counter is between 28” – 34” above the finish floor.
- Knee clearance to be a minimum 27” high, 30” wide, and 19” deep.
Exception: Knee clearance is not required at checkout counters or service counters.
- Clear floor space a minimum of 30” by 48”.
- Clear floor space adjoins an accessible route.
- In existing buildings, at least one checkout aisle shall be accessible in facilities with less than 5,000 square
feet of selling space.
- In facilities of 5,000 square feet or more of selling space, at least one of each design of checkout aisle shall be
made accessible when altered until the number of accessible checkout aisles of each design equals the
number required in new construction.See red marks on the following sheets of drawing:A-0, A-0.1,A1.1, A1.2, A1.4, A1.5, A2.0, A2.1, A-3.0, and A-6.Please resubmit the marked up set with revised sets of plans for recheck.