HomeMy WebLinkAbout198946_1_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10182807
PROJECT ADDRESS:
2677 N Main St Unit# 1050
PLAN CHECK ENGINEER:
Heidari, FredTEL:714
647-5862FAX:714
647-5897
TYPE OF CONSTRUCTION:
I B, SPK
OCCUPANCY CLASSIFICATION(S):
B
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/8/2014
INITIAL REVIEW
10/13/2014
EXPIRATION
4/6/2015
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Carolyn Doyle Larson
3.
TEL:
(949)679-6456
FAX:
VALUATION:$84,580.00
EMAIL:
FLOOD ZONE:X-0602320163J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTS
All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:
- Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans
should be submitted to expedite the process.
- - Police Department approval on the corrected/final set of drawings (647-5840)
- Public Works Agency approval (647-5039)
- Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance Doors, when fully opened, shall not reduce the required width of a corridor by more than 7”. Doors in any position shall not reduce the required width by more than one-half. The two doors from this space into the corridor shall swing 180 degree to comply.The width of the level area on the side to which the door swings shall extend 18” past the strike edge of the door for interior doors. CBC Section 11B-404.2.4.Show compliance for the bathroom doors.