HomeMy WebLinkAbout196340_2_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10181963 PROJECT ADDRESS: 1102 N Evonda St PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3, U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 7/16/2014 INITIAL REVIEW 10/6/2014 EXPIRATION 1/12/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Leon Tran 3. TEL: (714)418-6604 FAX: VALUATION: $56,540.00 EMAIL: tran1282002@yahoo.com FLOOD ZONE:A-0602320143J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2013 California Residential Code (CRC); 2013 California Building Code (CBC); CMC = 2013 California Mechanical Code; CPC = 2013 California Plumbing Code; CEC = 2013 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 3corrected sets of plans.(when needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment. Please refer to red marks on the drawings for additional plan check comments. Mark up drawings must be returned with revised plans. Plans resubmitted without the red markup set may result in delayed review time and additional plan check fees. All drawings and supporting documents shall be prepared, stamped, and signedby a California licensed architect or registered professional engineer. (CRC R301.1.3, CBC 107.1 and 107.3.4.1). This review does not include mechanical, plumbing or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, and electrical work. Call 647-5800 for information. The applicant shall obtain clearances/approvals for the following, prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039). - Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. This project is in a special flood hazard area designated on the flood insurance rate map (FIRM) as zone A. This zone requires that the lowest finish floor elevation (including basement) of the structure shall be at (or above) base flood elevation determined by a hydrology study for the A zone, or at (or above) the base flood elevation specified for the AE zone, on the flood insurance rate map. All elevations must be referenced to the National Geodetic Vertical Datum. Reference should be made to the Flood Plain Management Ordinance, Santa Ana Municipal Code, Chapter 7, for complete requirements. Drawings shall show compliance with said ordinance including noting flood zone and finish floor elevation." Note on plans: "A Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE shall be completed by a California Licensed Land Surveyor or California Registered Civil Engineer who is authorized to practice land surveying. The completed ELEVATION CERTIFICATE must be submitted to the Building Inspector at the time of foundation inspection, and a final certificate must be submitted at the time of final inspection." Walls and concrete foundation stem walls of attached garages are required to comply with FEMA requirements and shall be at (or above) the base flood elevation. In lieu of soils investigation report per Sections 1803.6 of the 2013 California Building Code, revise structural calculations for minimum foundation/footing design requirements for small projects as follows: - Footing to have minimum reinforcement of: 2 #4 at top and 2 #4 at bottom. - The minimum depth of footings below undisturbed ground surface to be 12 inches. - Minimum width and thickness of the footing shall comply with Table 1809.7 of the 2013 CBC. Submit two copies of T-24 energy calculations based on 2013 Energy code. The residence shall conform to the State Energy Conservation Standards. Submit forms and calculations for review and blueprint the final forms on the plans. - Signed Energy Efficiency Documents must be printed on the plans. - Also, submit 2 copies of signed Energy Efficiency calculations. - The corrected/final drawings shall have the required energy efficiency compliance documentation with completed signature blocks filed on the plans. -Revise drawings to show compliance with Residential Lighting Design Guide.