HomeMy WebLinkAbout199080_3_Corrections.docxTENANT IMPROVEMENT
PLAN CHECK COMMENTS
COMMENTS
Planning & Building Agency
Building Safety Division
20 Civic Center Plaza
P.O. Box 1988 (M-19)
Santa Ana, CA 92702
(714) 647-5800
www.santa-ana.org
PLAN CHECK NO:
10182858 (Revision)
PROJECT ADDRESS:
2320 S Pullman St
PLAN CHECK ENGINEER:
Mazarji, ZacTEL:714
647-5831FAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
B, S-1
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
10/15/2014
INITIAL REVIEW
11/12/2014
EXPIRATION
4/13/2015
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Chris Polaski
3.
TEL:
(714)850-7575
FAX:
(714)850-7576
VALUATION:$3000.00
EMAIL:
cpolaski@bundyfinkel.com
FLOOD ZONE:X-0602320279J
APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH
CITY OF SANTA ANA AMENDMENTSResubmit 2corrected sets of plans.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5831 for an appointment.Indicate dimension to existing property lines to new window in the conference room and show fire rated window when required by Table 602 of CBC. Indicate U-factor and SHGC in compliance with T-24 Energy Standards.Show tempered glass for window in office room 114. Reference sheet S-4, provide enlarged and legible elevation including dimensions.
Revise drawings to show 1000 (Max) for soil bearing. In lieu of soils investigation report per Sections 1803.6 of the 2013 California Building Code, revise structural calculations for minimum foundation/footing design requirements for this projects per City of Santa Ana internal policy as follows:
- Allowable foundation pressure not to exceed 1000 PSF.
- Footing to have minimum reinforcement of: 2 #4 at top and 2 #4 at bottom.Indicate max cut for notched on the drawings. Provide dimension all new notched for beam on the drawings including elevations, Subject to filed verification. Submit structural calculations for design and justification of notched beam.