HomeMy WebLinkAbout197495_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10182311 PROJECT ADDRESS: 1900 E Carnegie Ave Unit# A PLAN CHECK ENGINEER: Mazarji, ZacTEL:714 647-5831FAX:714 647-5897 TYPE OF CONSTRUCTION: V B, SPK OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 8/21/2014 INITIAL REVIEW 10/31/2014 EXPIRATION 2/17/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Jill Nagel 3. TEL: (949)244-2574 FAX: VALUATION:$23,335.00 EMAIL: jnagel@nagelinteriorarchitecture.com FLOOD ZONE:X-0602320279J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. A separate sheet for response may be used.Resubmit 3 corrected sets of plans.Please return to red marks on the drawings for additional plan check comments and marked up set of drawings with corrections.(When needed) Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance:Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process.Fire Department approval on the corrected/final sets of drawings (714-573-6108)Police Department approval on the corrected/final set of drawings (647-5840.)Public Works Agency approval (647-5039.)Proof of Worker’s Compensation Insurance shall be required at the time of permit issuance.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” Show/note ventilation requirements on the plans in accordance with the CBC and California Mechanical Code (CMC) requirements for each type of use. Note on drawings: - Provide mechanical ventilation for each area/room in accordance with the 2013 California Mechanical Code.Note on drawings: Show/note LIGHTING requirements on the plans in accordance with CBC and California Electrical Code requirements for each type of use.Provide the following information to insure existing and new doors are accessible;The width of the level area on the side to which the door swings shall extend 24” past the strike edge of the door for exterior doors and 18” past the edge for interior doors. Provide specifications for doors hardware (i.e., lever type, push-pull panic, etc) to comply with disabled access requirements. The floor or landing at each side of an exit door shall be level and having a length in the direction of the door swing of at least 60” and the length opposite the direction of door swing of 44” as measured at right angles to the plane of the door in the closed position. (Correct detail on the drawings) Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slope no greater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.All entrances and exterior ground-floor exit doors to buildings and facilities shall be made accessible to persons with disabilities. Doorways shall have a minimum clear opening of 32” with the door open 90 degrees, measure between the face of the door and the opposite stop. Doorways require dimensioning on the plans to insure compliance with the required landing area/maneuvering clearances at doors. Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction. Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.All building entrances that are accessible to and usable by persons with disabilities shall be identified with a least one standard sign and with an additional directional signs, as required, to be visible to persons along approaching pedestrian ways. Required the bottom 10” of all doors except automatic and sliding shall have a smooth uninterrupted surface to allow the door to be opened by a wheelchair footrestWhere corridor walls are required to be one-hour fire-resistive construction by Section 1017, windows shall be protected by fixed glazing listed and labeled for a fire-protection rating of at least three-fourths hour in accordance with Section 715.5. The total area of windows in any portion of an interior corridor shall not exceed 25 percent of the area of the corridor wall of the room which it is separating from the corridor.When corridor walls are required to be of one-hour fire-resistive construction by Section 1017, every interior door opening shall be protected by a tight-fitting smoke-and-draft-control assembly having a fire-protection rating of not less than 20 minutes. Viewport in 20-minute rated door limited to 1 inch in diameter. Said doors shall not have louvers. Include the following notes with typical one-hour corridor section view:“Interior openings for other than doors or ducts shall be protected by fixed glazing listed and labeled for a fire protection rating of at least three-fourths hour in accordance with CBC Section 715.5.”“Penetrations in fire-resistive walls shall comply with CBC Sections 715 and 716.”“Cabinets such as recessed electrical panels, fire hose cabinets, and recess fire extinguisher cabinets constructed of steel are permitted, provided material is installed to seal the opening in the fire-resistive membrane or, alternatively, the steel cabinet has an adequate steel flange to seal the opening effectively.”“Other cabinets should be installed or recessed so that there is no reduction in the fire rating of the wall, or opening which would allow smoke to pass. This would mean that the cabinet must be surrounded with material which provides the equivalent of one-hour fire resistance.” Revise door schedule to show 20 minute fire rated doors. One hour fire rated door is not acceptable for one hour rated corridor. Show missing 20 minute fire rated door between Lobby and Hallway. Show 45 minute fire rated window when located in the one hour rated corridor. Please specify 5/8” Type “X” for one hour rated wall of one rated corridor. Plans shall indicate how required structural and fire resistive integrity will be maintained where a penetration will be made for electrical, mechanical, plumbing and communication conduits, pipes and similar systems. CBC Section 106.1.1 and CBC Chapter 7. Note on the plans the ICC Research Report number, U.L. number, State Fire Marshal number, or approval number of another agency accepted by the City of Santa Ana.CBC Section 1017.4, Air movement in corridors. Corridors shall not serve as supply, return, exhaust, relief or ventilation air ducts when required to be fire-resistive rated in accordance with Table 1017.1.Provide typical complete section view through one-hour corridor(s) showing compliance with CBC Sections 1017 and 708: - Fire/smoke damper locations, installation requirements, and required access doors. Refer to CBC Section 716 and Mechanical Code Section 606.Provide a complete architectural section of 1-HR. corridor detailing fire resistive rated construction of the walls and ceilings. Detail all fire rated duct and other penetrations CBC Sections 708.4, 1017.1, 715.1, Table 715.4 & 716.5.4.Drawings submitted to the Building Division for review shall provide the following information to insure compliance with CBC Chapter 11-B, Division 2:- An accessible entrance - An accessible route to the altered area - Accessible restrooms - Accessible telephone (if any) - Accessible drinking fountains, and - Parking, signage and alarms (FYI) It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal and State Accessibility Standards. City of Santa Ana does not have jurisdiction to enforce ADA compliance and it is the responsibility of designer. If applicable please remove notes referring to ADA compliance from drawings. This project is reviewed for compliance with State Accessibility Standards T-24). Drinking fountains serving the area of new work shall be accessible. Table 442.1 of CPC and Section 11-B 602 of CBC. (When applicable) Where counter are provide, one of each type is required to be accessible. at least 5 percent, but never less than one, of each type of station shall be located at a section of counter that is at least 36” long and no more than 28 to 34” high. Show accessible sink and table at lunch room. ( Where applicable counters to be accessible for both side, clients and employee side) Please refer to red marks on the drawings for providing elevation) - Provide a minimum 30” x 48” wheelchair clear floor space. - Provide knee space at tables at least 27” high, 30” wide and 19” deep. - Provide height of tables between 28” – 34” from the floor ground. Reference sheet A5.0; clarify if existing trusses are modified to attach the new suspended ceiling. Indicate ICC approved suspended ceiling on the drawings. (ICC number 1308 or other approved products).and ASTM C636. Or show compliance with comments below.Note ICC Research Report Number on the drawings for the suspended ceiling system OR provide complete structural calculations and drawings for suspended ceiling systems showing compliance with CBC Sections 711.3.1, 803.9, 1613, and 1705 (special inspections) and ASTM C635. Please specify plan check number for site approval as it was previously approved by Building department. Please return marked up set of drawings with corrections.