Loading...
HomeMy WebLinkAbout200274_2_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 10183285 PROJECT ADDRESS: 909 N Grand Ave PLAN CHECK ENGINEER: Heidari, FredTEL:714 647-5862FAX:714 647-5897 TYPE OF CONSTRUCTION: III B OCCUPANCY CLASSIFICATION(S): U PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 11/25/2014 INITIAL REVIEW 12/4/2014 EXPIRATION 5/24/2015 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. George Saelzler 3. TEL: (909)626-0705 FAX: VALUATION:$425,000.00 EMAIL: Georges@evasigns.com FLOOD ZONE:X-0602320163J APPLICABLE CODE: 2013 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5862 for an appointment.This review does not include electrical work. Separate plan, application, fee, plan check, and permitis required for electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceState Division of Occupational Safety Permit (Cal/OSHA) (939-0145). A Cal/OSHA permit is required for: - Construction of trenches or excavations which are 5‘or deeper and into which a person is required to descend. - The construction or demolition of any building, structure, false-work, or scaffolding more than three stories high or the equivalent height.Provide the following: - Provide a fully dimensioned site plan on each set of plans.Show location of the proposed sign on this site plan with dimensions that it will not over hang any property line. - Show all property lines of record on the site plan. The footing for this sign shall clearly indicates the 2500 PSI concrete will be filling the gap between 48 inch ROUND HSS and the 6 feet diameter by 31.5 feet excavated footing.Is there any rebar into the concrete footing?